Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

WAP-7 - तेरे जैसा यार कहाँ , कहाँ ऐसा याराना , याद करेगी दुनियां तेरा मेरा अफसाना. - Arjun Rai

Search Forum
<<prev entry    next entry>>
Blog Entry# 4271521
Posted: Mar 25 2019 (19:50)

31 Responses
Last Response: Jun 27 2019 (07:09)
2 Followers
Info Update
59352 views
11

Mar 25 2019 (19:50)   16352/Nagercoil - Mumbai CSMT Express (via Renigunta) (PT) | KWV/Kurduwadi Junction (4 PFs)
psanga_sur^~
psanga_sur^~   5610 blog posts
Entry# 4271521            Tags   Past Edits
#PuneSolapurDoubling
While traveling in 16352 Nagarcoil - Tirupati - Mumbai Express, I have observed following progress of doubling.
Wadshinge - Interlocking work for UP main line is already completed new signals are ready for functioning.
Kurduwadi - Wadshinge to Kurduwadi outer track laid long back. Now the progress is KWV outer to KWV Junction new tracks are laid.
Major
...
more...
interlocking work is yet to be done, but all necessary tracks are laid.
So after doubling, line passing from PF 2 of KWV will be treated as UP Main line.
At present this line goes towards PVR/MRJ, therefore new track laid from KWV LC to KWV Pune end outer at extreme left side.
So this new line will goes towards PVR/MRJ after interlocking and existing PVR/MRJ line will be connected to new line towards Dhavlas from KWV outer. Here also new signaling system is installed and ready for testing.
(At present, construction of new platform beside PF 1 for 24 coaches trains will not be happening, so they will use PF 3 & 4 as usual).
Dhavlas - Construction of new platform is 80% completed. Tracks already laid in entire stretch.
Only interlocking work is remaining.
Kem - Bridge work at Kem outer is completed and PF 1 is closed for constructing new up main line adjucent to it.
Bhalawani - Here also platform work is 80% completed. Entire stretch from Wadshinge is ready for CRS after interlocking work.
After Bhalawani I haven't seen much progress, only leveling work is going on.

Translate to English
Translate to Hindi

3 Public Posts - Tue Mar 26, 2019

1 Public Posts - Wed Mar 27, 2019

2 Public Posts - Sat Apr 06, 2019

1 Public Posts - Sun Apr 07, 2019

1 Public Posts - Mon Apr 08, 2019

1 Public Posts - Wed Apr 17, 2019

3 Public Posts - Thu Apr 18, 2019

2 Public Posts - Sat Apr 20, 2019

2 Public Posts - Mon Apr 22, 2019

3 Public Posts - Thu Apr 25, 2019

1 Public Posts - Fri Apr 26, 2019

3 Public Posts - Sat May 11, 2019

1 Public Posts - Sun May 12, 2019

2 Public Posts - Mon May 13, 2019

2 Public Posts - Wed Jun 19, 2019

1 Public Posts - Sun Jun 23, 2019

12515 views
1

Jun 26 2019 (22:48)
axn_kapil
axn_kapil   342 blog posts
Re# 4271521-32              
see Dhananja Hunasgi’s latest doubling status video then it seems there is no much work done, from Bhigwan to Washimbe still incomplete leveling work is seen, same as six month old video...
Translate to English
Translate to Hindi

1 Public Posts - Thu Jun 27, 2019
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy