Once upon a time, there was a great king called Vikramaditya - the WAM-4 - Shashank

Search Forum
<<prev entry    next entry>>
Blog Entry# 4350444
Posted: Jun 24 2019 (11:32)

5 Responses
Last Response: Jun 29 2019 (11:21)
1 Followers
Info Update
17622 views
5

Jun 24 2019 (11:32)   PRG/Prayag Junction (3 PFs)
ManishSinghPRYJ~
ManishSinghPRYJ~   1321 blog posts
Entry# 4350444            Tags   Past Edits
Updates regarding pfm-prg doubling.
In my last blog post /blog/post/4279560 on 03rd April, the ends on both the sides of pfm-south ganga bridge were having trees, jungles etc but this time on 13th June, both the sides have been almost layer formed with soil and then blast for laying of tracks. If the work continues with same speed in monsoon also, prg-pfm doubling will complete by sep-oct.
Pic 1: ganga bridge south (prg) side soil and blast layer is being covered from side with stones to prevent soil erosion.
Pic
...
more...
2, 3& 4: Levelling work view of south side of bridge from different distances.
I also recorded a knowledgeable video at the venue but can't upload as I don't have youtube channel and 463 mb video ( 4 mins) cannot be emailed also (as No email can be send above 15 mb).
So if any member can upload the video on his channel, he is requested to send me his whatsapp no. in a pvt blog to me.

Translate to English
Translate to Hindi

12551 views
6

Jun 24 2019 (11:59)
ManishSinghPRYJ~
ManishSinghPRYJ~   1321 blog posts
Re# 4350444-1               Past Edits
Prg-Ald have chances of doubling completion by next month.
As in my last blog post /blog/post/4279560
The poles for electrification of the doubled line between Ald to Prg were mostly erected, this time, I saw wiring also done fully.
Also, 300-400 metres stretch near Ald station east end which was not started ( may be due to wires from SSP coming perpendicular
...
more...
to the old line and passing above space for new doubled line). This time in that stretch, old military siding lines are removed, and one new line for doubling is laid, while one more new siding/loop line being laid along with electrification of all lines.
Now only, stone chips is to be thrown on newly laid tracks/sleepers and trials will start in Ald-Prg section. See pics:
Pic1&2: View of completed doubled line along with completed electrification between Ald-Prg as seen from Rambagh ROB.
Pic3: View of that stretch where no construction had started in April blog and now full doubled line is laid along with electrification, and levelling work for one more loop line/ siding in progress.

Translate to English
Translate to Hindi

10699 views
2

Jun 24 2019 (12:08)
Reva18~
Reva18~   56837 blog posts
Re# 4350444-2              
According to this article - click here
15 जुलाई तक प्रयाग स्टेशन से इलाहाबाद जंक्शन तक रेलवे लाइन डबलिंग का काम पूरा हो जाएगा
Translate to English
Translate to Hindi

10447 views
2

Jun 24 2019 (12:29)
ManishSinghPRYJ~
ManishSinghPRYJ~   1321 blog posts
Re# 4350444-3              
Partially Correct
There are chances of Ald-Prg doubling completion by 15 Jul as said in article.
But full Ald- Lko route doubling is given wrong.
Ald-Lko will be double lined only from Ald-Pfm and Rbl-Lko if we go via Unchahar & Ald-Pfm and Pbh-Lko if we go via Pbh and both the routes will take atleast upto March for above said doubling except Ald-Pfm.
...
more...

And Ald-Prg line lies almost in NR jurisdiction except a small stretch of 300-400 mtrs near Ald east.So paperwale knows nothing and type whatever they like for eg NCR has completed its task and NR .......

Translate to English
Translate to Hindi

10499 views
1

Jun 24 2019 (12:30)
skm^~
skm^~   2113 blog posts
Re# 4350444-4              
Great news.Ironically by the time ALD-PRG is doubled, the pass traffic on this stretch has already been reduced by more than 50 percent as all 16 trains originating from ALD has been shifted to Prayag ghat.But goods traffic remains & doubling will be useful for smooth operation..
PRG-Phaphamau ( 6 kms) remains a bottleneck & may be done before year-end..
Translate to English
Translate to Hindi

9799 views
0

Jun 29 2019 (11:21)
way_thelong^~
way_thelong^~   8849 blog posts
Re# 4350444-5              
14511/14215 may return
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy