Search Forum
Blog Entry# 4350958
Posted: Jun 24 2019 (23:11)
8 Responses
Last Response: Jul 29 2019 (17:54)
8 Responses
Last Response: Jul 29 2019 (17:54)
WR/Western
riz339~ 335 news posts
Fifteen pairs of trains running with LHB design rakes could soon be run at a maximum permissible speed (MPS) of 130 kmph between Mumbai and Nagda...
4 Public Posts - Mon Jun 24, 2019
3 Public Posts - Tue Jun 25, 2019
good start. better late than never. All the LHB rakes should run at max permissible limits in each of the sections to take advantage of the investment that has been made in the new technology. This will free up the tracks also leading to increase in punctuality of all the trains and subsequently allow new trains