Yesterday In ECOR pink book 1 new project added as below. Is this project tells that rakes can be maintained in open lines without pits? If it is so then it can be done at Purulia also na? Anybody if can explain what this project is for????
" Upgradation/augmentation of rolling stock (incl DPRS) maintenance
facilities in open line (in East Coast, Northeast Frontier, South East
Central,...
more...
" Upgradation/augmentation of rolling stock (incl DPRS) maintenance
facilities in open line (in East Coast, Northeast Frontier, South East
Central,...
more...
12 Posts
Sick line is primarily meant for stationing specially for loading and unloading. SM is not done on those tracks.
Ok thanks for your reply...
That means that is for freight trains loading unloading ...
That means that is for freight trains loading unloading ...
I don't think so.. there are washing lines kind of raised Walkway between tracks for two tracks I guess, it was kept there. Wheel inspection have a different track or not I am not sure, experts to through more light on it, but there is a live wheel inspection system installed near Mahalimarup in CKP division and not CKP station, which instantly sends messages to the nearest stations about flat wheels, cracked wheels etc.
I think sir you are correct..
In some youtube video many months back i have seen that in 1 line towards the left end when you travel from rourkella side towards howrah then on left side in Chakradharpur yard side there is 1 line with raised platform and Howrah-CKP pgr was kept parked there in day time...that is before introduction of Ckp-Tata pgr spl time i am talking of. I have seen that video many months back now i remember and that narrow raised platform with 1 line looks exactly like Pitlines in ckp......so i can relate that to your reply...i think you are correct. But experts can say better whether 1 pitline is actually there in ckp
In some youtube video many months back i have seen that in 1 line towards the left end when you travel from rourkella side towards howrah then on left side in Chakradharpur yard side there is 1 line with raised platform and Howrah-CKP pgr was kept parked there in day time...that is before introduction of Ckp-Tata pgr spl time i am talking of. I have seen that video many months back now i remember and that narrow raised platform with 1 line looks exactly like Pitlines in ckp......so i can relate that to your reply...i think you are correct. But experts can say better whether 1 pitline is actually there in ckp
You seem more accurate. I visited CKP in 2013 so things have changed a lot along with 3rd line work. That wheel inspection has been boon for SER. Many defects have been rectified since then.