Search Forum
Blog Entry# 4377262
Posted: Jul 13 2019 (21:04)
6 Responses
Last Response: Jul 14 2019 (02:15)
6 Responses
Last Response: Jul 14 2019 (02:15)
Other News
ER/Eastern
AmishKumar^~ 4295 news posts
- डेढ़ साल में सिर्फ ब्लास्ट और रास्ता बनाने का ही हुआ काम
...
...
2 Posts
Post likhne wala lgta h gaya nhi h dekhne tunnel
Kya kam hua h ya nhi
Sidha jo man me aaya likh diya
Kya kam hua h ya nhi
Sidha jo man me aaya likh diya
Cutting hoga fir kuch construction usme line bichayega bahut kaam h
construction of tunnel is not more than 90 days work. TBM machine can do it. Indian railway has to construct only 380 m tunnel. it is one of the shortest tunnel of indian Railway.Min speed of TBM is 10m to 90m per day.
So it is a very easy task for contractor. I request Indian railway and all literate community to spread the real fact of tunnel to control corruption and loot in the name of Tunnel.It is already too much delayed.
So it is a very easy task for contractor. I request Indian railway and all literate community to spread the real fact of tunnel to control corruption and loot in the name of Tunnel.It is already too much delayed.
it depends on the type of stone. this isn't a metro tunnel where most of the boring is through soil. its made of quartz which is one of the hardest found common mineral which is bound to take time to bore through. this is one of the prime reason that the other tunnel is still usable even though it was built in 1861.