गोरखपुर, जेएनएन। आखिरकार, सरकार ने सहजनवां- दोहरीघाट लगभग 80 किमी नई रेल लाइन को मंजूरी दे ही दी। प्रधानमंत्री नरेंद्र मोदी की अध्यक्षता में बुधवार को...
To connect mau directly they need Y leg for indara-mau
Else LR at Indara needed
Well this will take minimum 4-5 years to build thi
1st GC
Then new line
Else LR at Indara needed
Well this will take minimum 4-5 years to build thi
1st GC
Then new line