A letter posted today in 'the Telegraph newspaper by a long time resident of the steel City visiting Jamshedpur after many years (travelled from Ernakulam).....says a lot about the train. No change even after so many decades !!
If we pick best crawlers of IR, it has To be in top-5 or may be in top-3
For 13352 we can reduce about 30 min between ERS and CBE. 13351 almost 2 to 3 hrs between CBE and ALLP can be reduced. Both are a result of diversion from SRR.
Even after SRR has been removed.....no change in running time between CBE-ALLP. 13351 takes almost 9 hrs to cover 260km. ( less than 30km/hr!!) just to cater to the daily passengers between ERS-Allp wherea the same dist in return train 13352 takes 5.5 hrs which is ok but ca =n be further reduced