Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Purvanchal Express - Poorvottar ka Sikandar

Search Forum
<<prev entry    next entry>>
Blog Entry# 4409228
Posted: Aug 24 2019 (09:03)

34 Responses
Last Response: Oct 12 2019 (16:23)
General Travel
41936 views
34

★★★
Aug 24 2019 (09:03)   22157/Mumbai CSMT - Chennai Egmore SF Mail (PT) | KWV/Kurduwadi Junction (4 PFs)
psanga_sur^~
psanga_sur^~   5631 blog posts
Entry# 4409228            Tags   Past Edits
#PuneSolapurGulbargaDoubling
Detailed status of doubling and electrification of Pune - Solapur section.
As a part of Solapur - Daund doubling, day before yesterday CRS completed between Wadshinge and Bhalawani.
As per the current status, Bhalawani and Dhavalas stations will be fully operational from today. Work at Wadshinge is already completed. Kem station will be operational from 29 Aug, as existing main
...
more...
line should be realigned to accommodate new UP Main Line. As of now, only down side loop line is operational at Kem. At Kurduwadi Junction, major remodeling work is completed. Some minor works are remaining.
Disappointing thing at Kurduwadi is after realignment Pandharpur line will be branch line from UP Main line at Pune outer as shown in the video. It should be separate line coming from PF1 of Kurduwadi to ease the operation.
From Kem to Madha, foundation base for installing poles are created on both lines. Poles are also installed near Kem.
PFB sequence of doubling images.
1. Caution board at Bhalawani.
2. New line at Bhalawani ready for operation.
3. Bhalawani new TB
4. Temporary tents installed at outer of all stations consist of ASM for ease of operation.
5. Middle line is closed for changing alignment at Kem.
6. Another view of Kem Station after doubling (middle line in the image is new line).
7. Electric poles installed on Kem - Dhavlas section.
8. New TB of Dhavlas Station.
9. UP Main line and new loop line is ready for operation.
10. New signaling system will be operational from today.

Translate to English
Translate to Hindi

32 Posts

13997 views
1

Sep 03 2019 (10:09)
Aslam Shaikh   395 blog posts
Re# 4409228-33              
Your details are more or less accurate. I guess you have been travelling frequently on this route.
Translate to English
Translate to Hindi

14201 views
0

Sep 03 2019 (11:40)
psanga_sur^~
psanga_sur^~   5631 blog posts
Re# 4409228-34              
Yes, due to hometown as Solapur and work place as Pune.
Translate to English
Translate to Hindi

13791 views
0

Sep 04 2019 (18:36)
Chinmay15~
Chinmay15~   2517 blog posts
Re# 4409228-35              
Wadshinge Bhalawani new track is in use?
Translate to English
Translate to Hindi

13585 views
1

Sep 04 2019 (19:41)
Aslam Shaikh   395 blog posts
Re# 4409228-36               Past Edits
Yes new track is being used and traffic on both tracks are up and running.
Translate to English
Translate to Hindi

10665 views
0

Oct 12 2019 (16:23)
Chinmay15~
Chinmay15~   2517 blog posts
Re# 4409228-37              
is any news regarding pending work? Any update
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy