Search Forum
Blog Entry# 4418478
Posted: Sep 04 2019 (17:56)
6 Responses
Last Response: Sep 10 2019 (11:20)
6 Responses
Last Response: Sep 10 2019 (11:20)
IR Affairs
SER/South Eastern
AdittyaaSharma^~ 68328 news posts
हावड़ा-मुंबई मार्ग में चौथी रेललाइन बिछाने का सर्वे दक्षिण-पूर्व जोन में शुरू हो गया। यात्री ट्रेनों को समय से तेज रफ्तार में चलाने व ढुलाई क्षमता...
read more... चौथी रेललाइन से जुड़ेंगे टाटानगर-खड़गपुर
1 Posts
In budget pink book 4th survey is there for SRC-KGP 4th line .....not heard about KGP-TATA 4th line survey...
I also heard of JSG-TATA, however KGP-TATA has lesser traffic compared to HWH-KGP and TATA-JSG, so this portion will be the last. also for 3rd line, this section was the last.
SRC-KGP 4th line is very much needed....the way trains are increasing in SER...4th line needed ....... hope this project comes in next year Pink book and gets work started before Bengal election in 2021.....land already available with SER for 4th line except at few locations minor aquisition may be required for construction of loops......
3&4th line se bhi jyada important Tatanagar ke platforms ki sankhya bandhani chaiye is par kabhi baat hi nahi hota hai.5 platforms toh local station me hote hai.platfoms me busy hone ke Karan train ko Aditya pur me rok Diya jata hai station me Kam se Kam total 11 se 12 platforms ho sakta hai 5 aur platforms aaram se bansakta hai aur second entry ko bhi acha se banaya Jaa sakta hai
Actually PFs are 6, one terminal and 5 through. Heard of increasing one more island with two PFs after PF#5.