Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

RailFans - once you meet them, friends for life

Search Forum
<<prev entry    next entry>>
Blog Entry# 4472944
Posted: Oct 30 2019 (14:31)

24 Responses
Last Response: Nov 07 2019 (13:05)
Rail News
43075 views
0

New Facilities/Technology
SWR/South Western
Oct 30 2019 (14:31)   Minister asks officers to revise time of Vasco train

sachinature~   1669 news posts
Entry# 4472944   News Entry# 394089         Tags   Past Edits
MoSR Shri Suresh C Angadi instructed Railway to take action immediately on problems at  Belagavi area especially the Road surface of ROB at the Gogte circle...

19 Posts

26910 views
1

Nov 05 2019 (21:44)
sachinature~
sachinature~   8588 blog posts
Re# 4472944-20              
Not sure, but some pf issues at Pvr.
Translate to English
Translate to Hindi

23996 views
0

Nov 05 2019 (22:29)
irifan2015~
irifan2015~   2431 blog posts
Re# 4472944-21              
How did you get 15 trains to Mumbai? There are only 3 trains but only one is exclusive Bangalore Mumbai. What you are seeing in time table are passing through trains which do not touch Bangalore or Mumbai or both cities and with no seats quota for SBC Mumbai pax. Surprisingly all three trains are run by central railway. Nothing by SWR!.
What is the use of doubling and electrification if trains take 24 hours to cover 1100 kms?
Translate to English
Translate to Hindi

24251 views
1

Nov 05 2019 (22:32)
Daniel~   768 blog posts
Re# 4472944-22               Past Edits
Udyan is the only dedicated train. Coimbatore exp touches sbc. Most of the trains pass through kalyan. A dedicated train via dvg, ubl,bgm,Pune is required.
Translate to English
Translate to Hindi

24796 views
0

Nov 07 2019 (12:53)
irifan2015~
irifan2015~   2431 blog posts
Re# 4472944-23              
On practical aspects, udyan is a crawler and from Mumbai side, wastes two mornings. CBE to LTT is ok, but wastes two days from SBC side. Chalukya no proper quota for Bangalore.
Why Chalukya should waste 3 hours in a heavy traffic Bangalore (YPR)? If the Puducherry Tirunelveli portion is cancelled, then it can reach YPR by 7:30 PM from Dadar. Similarly it can start from YPR by around 8:30 and still can reach Dadar by morning 6.
To compensate for Puducherry Tirunelveli, SWR can run triweekly from YPR starting
...
more...
by 10 PM.

Translate to English
Translate to Hindi

25354 views
0

Nov 07 2019 (13:05)
Daniel~   768 blog posts
Re# 4472944-24               Past Edits
Earlier chalukya train used to terminate at Ypr for some reason they have been extended upto Puducherry/Tirunelveli. May be CR extended it as the rake belongs to them. It should speeded up in both directions.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy