Intermediate block signalling:
Advanced signalling technique to handle more high speed trains bw two stations of automated block. Done by installing additional signal controls between two automated blocks . these additional signals are controlled by existing stations at the two ends only
Advanced signalling technique to handle more high speed trains bw two stations of automated block. Done by installing additional signal controls between two automated blocks . these additional signals are controlled by existing stations at the two ends only