FACT I realised now:
Electrification in India can never reach 100% target bcz of Pamban Bridge,even if new bridge is constructed, elevation is not possible
In the future,Diesel loco lovers would go to Rameshwaram
Thanks to Pamban Bridge, Rameshwaram
...
more...
Electrification in India can never reach 100% target bcz of Pamban Bridge,even if new bridge is constructed, elevation is not possible
In the future,Diesel loco lovers would go to Rameshwaram
Thanks to Pamban Bridge, Rameshwaram
...
more...
9 Public Posts - Sun Mar 15, 2020
I am not sure, but I believe the new bridge will be constructed beside the existing one. If anything has to be changed, it will be the pillars as they are the ones that are too old and were constructed for MG.
The superstructure was changed once in 1964 when the bridge was washed away due to a cyclone and probably once more during GC.
The superstructure was changed once in 1964 when the bridge was washed away due to a cyclone and probably once more during GC.
3 Public Posts - Sun Mar 15, 2020
1 Public Posts - Mon Mar 16, 2020