Search Forum
Blog Entry# 4592818
Posted: Mar 15 2020 (12:29)
15 Responses
Last Response: Mar 21 2020 (02:09)
15 Responses
Last Response: Mar 21 2020 (02:09)
FACT I realised now:
Electrification in India can never reach 100% target bcz of Pamban Bridge,even if new bridge is constructed, elevation is not possible
In the future,Diesel loco lovers would go to Rameshwaram
Thanks to Pamban Bridge, Rameshwaram
...
more...
Electrification in India can never reach 100% target bcz of Pamban Bridge,even if new bridge is constructed, elevation is not possible
In the future,Diesel loco lovers would go to Rameshwaram
Thanks to Pamban Bridge, Rameshwaram
...
more...
13 Public Posts - Sun Mar 15, 2020
Now a days technology is so advance, that if the elevation is not possible, than why IR is not trying to under ground system? Presently in Mumbai & Calcutta Metro trains tunnel has been made below the river. so that they can achieve 100 % electrification & no restriction to crossing of ships & trains.
1 Public Posts - Sat Mar 21, 2020