Which of the Following Bypasses is much needed in KARNATAKA
For Maharashtra /blog/post/4605055
For Ap/Telengana /blog/post/4605289
For Maharashtra /blog/post/4605055
For Ap/Telengana /blog/post/4605289
NO vote
Londa Bypass
67%
22
Mysuru Bypass
6%
2
Bangarapet Bypass
3%
1
Bidar Bypass
0%
0
Chikjajur Bypass
0%
0
Kalaburagi Bypass
15%
5
Hassan Bypass
0%
0
Birur Bypass
0%
0
Any other mention in comments plz👇
9%
3
🔹Gadag bypass line is already under construction and it must be completed as soon as possible
🔹Londa bypass line must be constructed as soon possible because 8 trains (4 pairs) have Loco Reversal (LR) at LR. There will be many freight trains which require LR at Londa. So Londa bypass line must be constructed on second priority. First priority must be given to Gadag bypass line
🔹Londa bypass line must be constructed as soon possible because 8 trains (4 pairs) have Loco Reversal (LR) at LR. There will be many freight trains which require LR at Londa. So Londa bypass line must be constructed on second priority. First priority must be given to Gadag bypass line