Search Forum
Blog Entry# 465650
Posted: Jun 26 2012 (20:12)
15 Responses
Last Response: Jun 26 2012 (20:36)
15 Responses
Last Response: Jun 26 2012 (20:36)
10 Posts
expected a lot in the south section. but well.....................nothing.
Yes. I agree with you. But, IR should introduced
1. Two pairs of BRP-DKAE local
2. One pair of Hasnabad-LKPR EMU
3. Two pairs of BRP-SDAH, SPR-SDAH, NMKA-SDAH.
1. Two pairs of BRP-DKAE local
2. One pair of Hasnabad-LKPR EMU
3. Two pairs of BRP-SDAH, SPR-SDAH, NMKA-SDAH.
And new railway track should be laid to connect Sandeshkhali and Hingalganj.