Last leg of #JBPBTCGC i.e., Lamta-Samnapur track linking has been done!
7 Posts
Ya MP has a great railway future ahead
But the only loss will ve of itarsi it will lose most of the patna up bihar
Connectivity after it
But it will give chance to new trains to ply because as of now et ngp section is over saturated
But the only loss will ve of itarsi it will lose most of the patna up bihar
Connectivity after it
But it will give chance to new trains to ply because as of now et ngp section is over saturated
Anyways station construction, signalling and electrification work will take 3 months atleast