Last leg of #JBPBTCGC i.e., Lamta-Samnapur track linking has been done!
3 Public Posts - Wed Jul 15, 2020
1 Public Posts - Thu Jul 16, 2020
Finally, one milestone is achieved. It was a much required link as all the load of east UP/BR to South was falling on the shoulders of ET-NGP section.
JBP-G and INDB-KNW-AK are the two most awaited GC projects not only for MP but also for the other states.
However, unfortunately the Corona situation is quite bad in UP, MH, Telangana and TN. Bihar is already under Lockdown. So I don't see the normal trains plying on this section atleast till October, which kinda disappointing for most of the railfans.
Let's...
more...
JBP-G and INDB-KNW-AK are the two most awaited GC projects not only for MP but also for the other states.
However, unfortunately the Corona situation is quite bad in UP, MH, Telangana and TN. Bihar is already under Lockdown. So I don't see the normal trains plying on this section atleast till October, which kinda disappointing for most of the railfans.
Let's...
more...