Search Forum
Blog Entry# 4681752
Posted: Aug 05 2020 (18:11)
19 Responses
Last Response: Aug 06 2020 (18:05)
19 Responses
Last Response: Aug 06 2020 (18:05)
Can SR run a MAQ PDY train via Hassan, Chikkabanavara, KJM, KPD? Distance is 794 kms same as that of via SRR.
This can start by 1300 from MAQ to reach KJM by 2230 and use PDY Chalukya slot till PDY. Return can be in Chalukya slot (2045) till KJM. From KJM, can leave towards BAW by 0445 and reach MAQ by 1300.
Many advantages include connection to unconnected areas especially pilgrimage centres of Subramanya and Dharmasthala in South Canara and Tiruvannamalai, Tirukkovilur in TN.
When...
more...
This can start by 1300 from MAQ to reach KJM by 2230 and use PDY Chalukya slot till PDY. Return can be in Chalukya slot (2045) till KJM. From KJM, can leave towards BAW by 0445 and reach MAQ by 1300.
Many advantages include connection to unconnected areas especially pilgrimage centres of Subramanya and Dharmasthala in South Canara and Tiruvannamalai, Tirukkovilur in TN.
When...
more...
15 Posts
Still unable to understand why SWR Mysore is not connecting it's own areas like Hassan, Sakleshpura, Chitradurga, Chikmagalur, Shimoga, Davangere, Harihar. No proper train to these stations.
Weekly trains should introduce from Mangalore via Hassan to Hyderabad/Chennai/Visakhapatnam... Bijapur train should extend till Bidar....
All such trains should go via Hassan. If this is not mentioned, all will go via SRR.
In June, there was an article that had come where it was mentioned that The Hassan Mangalore Rail Development Company Limited installed signalling systems and permitted crossings at two stations which will now allow 24 trains to run along the Hassan-Mangaluru line instead of 10 until now. Lets hope it is done, though the same article mentioned that additional ones could all be goods trains which can help massively in transporting fertilisers from Mangaluru to the hinterland of Karnataka. Lets hope passenger trains are also introduced.
Article attached !
Article attached !
If 4 pairs of passenger trains per day are allowed, it would be excellent.
One can have MYS CST, MYS ASR, MYS JP, MAQ KCG, MAQ MAS, MAQ BIDR, MAQ VSKP, etc.
But will it happen?? Long wait.....
One can have MYS CST, MYS ASR, MYS JP, MAQ KCG, MAQ MAS, MAQ BIDR, MAQ VSKP, etc.
But will it happen?? Long wait.....