Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Shabdbhedi Express: गति इसकी शब्दों को भेदती है, पूरब को पूर्वांचल से जोड़ती है - Dr. Abhishek Rai

Search Forum
<<prev entry    next entry>>
Blog Entry# 4682749
Posted: Aug 07 2020 (15:45)

7 Responses
Last Response: Aug 23 2020 (13:23)
General Travel
20473 views
1

Aug 07 2020 (15:45)   22707/Visakhapatnam - Tirupati AC Double Decker Express
Rajesh~
Rajesh~   2349 blog posts
Entry# 4682749            Tags  
This train is running with only 10 coaches. Railways can add 3rd AC - 6 coaches, 2nd AC - 2 coaches, 1st AC - 1coach.
Do that this will benefit for Visakhapatnam
Translate to English
Translate to Hindi

2 Posts

12518 views
0

Aug 07 2020 (15:58)
Ravi~
Ravi~   3492 blog posts
Re# 4682749-3               Past Edits
Telugu ra ledhu. Kuncham kuncham Telugu. I am still learning the language.
Translate to English
Translate to Hindi

12023 views
2

Aug 07 2020 (17:41)
deepak.yerr~
deepak.yerr~   6105 blog posts
Re# 4682749-4              
It should be replaced with SF with 22 LHB coaches. There is no use of adding AC sleeper coaches only as the AC chair cars will run empty. Instead they be replaced with sleepers. The config can be 2 2AC 6 3AC 6SL 6GS 2EOG total 22. As both directions it runs as intercity enough of GS coaches should be there. I am sure it will be super hit just like KCG after adding 3 AC and SL is hit and added more coaches in just a month.
Translate to English
Translate to Hindi

10557 views
0

Aug 09 2020 (23:09)
AmaravatiExpress~
AmaravatiExpress~   1074 blog posts
Re# 4682749-5              
agree.. it should be replaced with Sf with mixed rake.
would propose small modification in CC.. Eog A2 B6 S6 C2 D4 Eog.
There should not be any Unreserved General coaches in this one.
Translate to English
Translate to Hindi

11961 views
1

Aug 10 2020 (00:09)
VIJAY~
VIJAY~   1065 blog posts
Re# 4682749-6              
A new dedicated super fast train should be run between Vskp-Tirupati it can be via Bhimavaram once doubling+Electrification works and Gudur 3rd line works are done so that it covers maximum area and slot availability will be high.
Translate to English
Translate to Hindi

9993 views
0

Aug 23 2020 (13:23)
supersai~   46 blog posts
Re# 4682749-7               Past Edits
Instead, make it as a secondary coach and run Uday till TPTY on a daily basis. With a bit aggressive schedule and revised TT Train can be made to reach TPTY by 6.30pm.

Some thing like
VSKP 7.00am
BZA
...
more...
12.30pm
GDR 4.30pm
RU 6.00pm
TPTY 6.30pm

For this to happen, SCR should handover DD coach to Ecor or vice versa.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy