Aug 24 2020 (15:43) Railways plans four more DFCs by 2030 with total investment of Rs 1.8 lakh crore
surjitbasu~ 13 news posts
A detailed feasibility study is being undertaken and the report is expected to be prepared by December 2021.
To...
To...
4 Public Posts - Mon Aug 24, 2020
There is a road under bridge between Andal station and yard which limits the number of tracks passing over it. In order to increase platform length railways has to demolish the whole bridge. State government objected to it unless a viable alternative is made available cause that's the only road connecting point of north and south in the town and Kazi Nazrul Islam airport on continuation.