Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Tamil Nadu Express - தங்களை அன்புடன் வரவேற்கிறது - Swaroop Kutti

Search Forum
<<prev entry    next entry>>
Blog Entry# 4703137
Posted: Sep 03 2020 (02:25)

6 Responses
Last Response: Sep 03 2020 (14:23)
Rail News
31345 views
2

IR Affairs
NR/Northern
Sep 03 2020 (02:25)   500 trains, 10,000 stops could go in ‘reimagined’ post-Covid timetable

shailshekhara   253 news posts
Entry# 4703137   News Entry# 417451         Tags   Past Edits
Some 500 regular trains will be discontinued and 10,000 stops across the Indian Railways’ network will be erased in a new timetable for operations that will...

1 Posts

19889 views
0

Sep 03 2020 (07:54)
IlovemyINDIA~   2584 blog posts
Re# 4703137-2               Past Edits
All these IIT theory will be crashed once regular trains will start running again in reality. It is not that easy that a railway which is a lifeline of India and running for so many decades and the timetables of so many trains can be modified so easily10,000 around stops removed, 500 trains Cancelled, etc and all can be done from some IIT persons sitting at 1 place and some officials sitting in AC Rooms without doing ground reality survey statewise, areawise, local needwise. All these on paper is very easy but when passengers will demand back for the Cancelled trains and when existing trains will get 200% overcrowded due to these 500 Cancelled trains, also political pressure will come then IR and RB will be forced to either bringback those Cancelled trains, provide stoppages that removed or else will be forced to run New trains to cater...
more...
the rush. Lets see what happens.
Before cancelling trains, removing stops a detailed ground reality survey is needed areawise, statewise, and also before removing stops each stops on ground to be surveyed, each train must be on ground detailed survey needed which is a long process of say 2 to 3 years that needs to be done . And around 500 trains cancelling and around removing around 10000 stops is a very big task that cannot be done sitting in AC rooms and i am Confirmed this theory will get 100% failed when regular trains will run again. IR which carries crores of passengers is not that easy if this news article is correct. Lets see what happens

Translate to English
Translate to Hindi

15056 views
0

Sep 03 2020 (11:13)
ERIsLove~
ERIsLove~   72 blog posts
Re# 4703137-3               Past Edits
True 🙂
Translate to English
Translate to Hindi

15268 views
0

Sep 03 2020 (11:16)
FraudsterConman
FraudsterConman   7672 blog posts
Re# 4703137-4              
cancelling 500 trains not solution to problem. eliminating unimportant halts must be done
Translate to English
Translate to Hindi

14293 views
0

Sep 03 2020 (11:32)
upendra1984~
upendra1984~   290 blog posts
Re# 4703137-5              
बिल्कुल सही कहा भाई।
भयंकर प्रेशर आएगा। बिल्कुल ऐसा

/blog/post/4680264

डेटा
...
more...
साइंस का जमाना है, लोग अभी भी पुराने ढर्रे पर चल रहे हैं।

Translate to English
Translate to Hindi

12511 views
0

Sep 03 2020 (14:23)
CrazyTraveller~
CrazyTraveller~   3539 blog posts
Re# 4703137-6               Past Edits
Aise to kavi stop koi hatne hi nae dega har station me 4 chillar mil jayege baithne ke liye to kya usnke liye sf train ko barbad karta rhe rb kyuki avi tak to aisa hi hota haii
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy