JSW Toranagallu siding line electrification updates:
1. Height limits placed on LCs of JSW Siding line.
2. Wiring is from TNGL side.
3. Wiring is done till certain distance.
Pics: Self
Date:...
more...
1. Height limits placed on LCs of JSW Siding line.
2. Wiring is from TNGL side.
3. Wiring is done till certain distance.
Pics: Self
Date:...
more...
CRS is not required for RNJP Line since it is only used by frieght. So the line is commissioned as electric line without CRS😊.
Any possibility of introducing passenger services on this line?
IMO Passenger train might not start on this line because this line was made as a broad gauge since beginning and till date no passenger train had ran on it.