Search Forum
Blog Entry# 4719115
Posted: Sep 18 2020 (12:26)
4 Responses
Last Response: Sep 18 2020 (13:29)
4 Responses
Last Response: Sep 18 2020 (13:29)
JSW Toranagallu siding line electrification updates:
1. Height limits placed on LCs of JSW Siding line.
2. Wiring is from TNGL side.
3. Wiring is done till certain distance.
Pics: Self
Date:...
more...
1. Height limits placed on LCs of JSW Siding line.
2. Wiring is from TNGL side.
3. Wiring is done till certain distance.
Pics: Self
Date:...
more...
CRS is not required for RNJP Line since it is only used by frieght. So the line is commissioned as electric line without CRS๐.
Any possibility of introducing passenger services on this line?
IMO Passenger train might not start on this line because this line was made as a broad gauge since beginning and till date no passenger train had ran on it.