Search Forum
Blog Entry# 4781910
Posted: Nov 17 2020 (19:17)
5 Responses
Last Response: Nov 19 2020 (18:00)
5 Responses
Last Response: Nov 19 2020 (18:00)
New Facilities/Technology
SWR/South Western
JaiVidarbha^~ 169 news posts
With an aim to cut down on the travel time, Indian Railways' South Western Railway(SWR) zone has upgraded the railway tracks in its sections which will...
Dadar - Hubballi - Dadar Exp can be converted into SF now, with upgrade in speed.
TT should be such that it reach BGM by 0530 and Hubli by 0815. Also there should be a connecting train to SBC/ MYS by 0900.
Yes, better to club the this train with Vishwamanava Exp, and run up to Mysuru.
Slight realignment with Vishwamanava is ok, but extension is not preferred. Extension of dR UBL if thought of should be to Ballari/ Guntakal. For Bangalore Mumbai, we should get a proper SF via SUR, RC, GTL. For MYS, CSMT MAJN Rocket SF should get extended.