Search Forum
Blog Entry# 4859046
Posted: Jan 28 2021 (15:35)
26 Responses
Last Response: Jan 31 2021 (19:05)
26 Responses
Last Response: Jan 31 2021 (19:05)
Jan 28 2021 (15:35) MTM/Machilipatnam (2 PFs) | LGD/WAP-7/30345
SaiCharan^~
SaiCharan^~ 3365 blog postsCrs inspection double line electrification from gudi vada to machilipatnam
SCR LGD WAP 7 30655 , 30345 will be taking charge for speed test in push pull mode
Pics 1-3...
more...
SCR LGD WAP 7 30655 , 30345 will be taking charge for speed test in push pull mode
Pics 1-3...
more...
21 Posts
Coa include cheyaledu ani gussainchindraa.. :D
Tappaledu mastaaru.. route congestion and yard congestion ani chepi coa ki gate musestunaaru..
Tappaledu mastaaru.. route congestion and yard congestion ani chepi coa ki gate musestunaaru..
MTM-VSKP should be introduced with revised timings. MTM-20:30
GDV- 21:00
BVRT: 21:45
RJY: 23:45
VSKP: 4:30
GDV- 21:00
BVRT: 21:45
RJY: 23:45
VSKP: 4:30
Kastam because sc lo loco change bza to sc chyachu munde but chyale
depends on ecor bcoz tat at vskp will be huge for the above timings