Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Talk to a RailFan - you will learn a LOT about Trains.

Search Forum
<<prev entry    next entry>>
Blog Entry# 4887353
Posted: Feb 24 2021 (18:28)

1 Responses
Last Response: Feb 24 2021 (21:06)
Rail News
59736 views
0

Commentary/Human Interest
ER/Eastern
Feb 24 2021 (18:28)   इलेक्ट्रिक ट्रेन दौड़ाने के लिए रेलवे ट्रैक तैयार

Anupam Enosh Sarkar^~   27783 news posts
Entry# 4887353   News Entry# 440644         Tags   Past Edits
जागरण संवाददाता, दुमका: दुमका से रामपुरहाट के बीच इलेक्ट्रिक चलाने के लिए बुधवार को हावड़ा के रेल सुरक्षा आयोग के आयुक्त एएम चौधरी ने दुमका से...

Rail News
49875 views
1

Feb 24 2021 (21:06)
MrMultiTalented~
MrMultiTalented~   2468 blog posts
Re# 4887353-1              
English version
Jagran Correspondent, Dumka: On Wednesday, Commissioner of Howrah's Railway Safety Commission AM Chaudhary inspected the railway line from Dumka to Harinsingha in Shikaripada to run electric between Dumka to Rampurhat.
At four in the morning, the commissioner arrived in Dumka with officers in two saloons. He was accompanied by a special check train from Howrah. Around five o'clock all the people reached Harinsigha in Shikaripada by train and checked the railway line. After this, the team members inspected the rail line coming from Harinsigha to Dumka. Got off the train at
...
more...
several places and saw the track. Measure the line. He told the officials that there is no shortage of any kind in the railway line. The first electric train can be run on it. The commissioner reached Dumka railway station with the entire team at one o'clock in the afternoon and inspected the railway line here as well. After inspecting for about half an hour, he went from the special salon to Dhanbad and the special train went to Howrah. Before leaving he said everything is fine. It will be decided to run the train even after getting permission from the railway. At the same time, another railway official said that there was no shortage of any kind in the railway line. All that was required to run the train was fully met. Now permission is awaited from Ministry of Railways.
Those inspecting included SSE Nitish Kumar, Commercial Inspector Aparesh Bhagat, CRPF Assistant Commandant Atul Sri Sagar, Inspector Ajayamani Tripathi, SI Rajkumar Gupta and Kalidas Hansda etc.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy