Search Forum
Blog Entry# 4891884
Posted: Mar 01 2021 (06:15)
2 Responses
Last Response: Mar 01 2021 (17:26)
2 Responses
Last Response: Mar 01 2021 (17:26)
Commentary/Human Interest
ER/Eastern
Anupam Enosh Sarkar^~ 27783 news posts
संवाद सहयोगी, गोड्डा : गोड्डा में ट्रेनों के परिचालन को ट्रायल की तैयारी अंतिम चरण में है। रेलवे महकमा अब पांच मार्च को होनेवाले सीआरएस (कमीशन...
read more... पांच को सीआरएस निरीक्षण, जल्द चलेगी ट्रेन
लगता है कि हमसफर से शुरुआत के चक्कर में 08603-04 को भी अभी सफर करना पड़ेगा(bgp से चलाने की मंशा होती तो अबतक चालू हो गई होती)
English version
Samvad Sahyogi, Godda: Preparation for trial of train operations at Godda is at an end stage. The railway department is now in the final swimming preparations for crs (Commission of Railway Safety) inspections on March 5. The pace of work on platform number one and two of Godda railway station is fast. All preparations are being completed. The railway line from Godda to Padaihat station is under thorough examination. Cables are being laid at the station with water, electricity system. The foot over bridge construction work is in the final stages. Train operations may commence by the first week of March or April.Earlier, the probable date of CRS was fixed on 15th February. It could not be done because of...
more...
Samvad Sahyogi, Godda: Preparation for trial of train operations at Godda is at an end stage. The railway department is now in the final swimming preparations for crs (Commission of Railway Safety) inspections on March 5. The pace of work on platform number one and two of Godda railway station is fast. All preparations are being completed. The railway line from Godda to Padaihat station is under thorough examination. Cables are being laid at the station with water, electricity system. The foot over bridge construction work is in the final stages. Train operations may commence by the first week of March or April.Earlier, the probable date of CRS was fixed on 15th February. It could not be done because of...
more...