Search Forum
Blog Entry# 498736
Posted: Aug 07 2012 (09:57)
No Responses Yet
No Responses Yet
Aug 07 2012 (09:57) 12346/Saraighat Express (PT) | NCB/New Cooch Behar (7 PFs)
MailguardSG25~
MailguardSG25~ 24054 blog postsSiliguri Jn BAAZ WDP-4 brings the 5 Hr late running Saraighat Exp into New Coochbehar PF#3 on 01.08.12.
The delay was due to the Power Snag over entire North India on the previous day & subsequesntly entire shut down of Rail Traffic on ER,as a consequence the Up train was delayed so as the Down train
The delay was due to the Power Snag over entire North India on the previous day & subsequesntly entire shut down of Rail Traffic on ER,as a consequence the Up train was delayed so as the Down train