Search Forum
Blog Entry# 4987589
Posted: Jun 16 2021 (23:44)
9 Responses
Last Response: Feb 21 2023 (10:54)
9 Responses
Last Response: Feb 21 2023 (10:54)
Jun 16 2021 (23:44) 12601/MGR Chennai Central - Mangaluru Central Mail (PT)
Vinay Kumar
Vinay Kumar 23030 blog postsMay 12 1862. Inaugural run. How? Till 30th June 1862 Madras Railway was 312 Miles, 90 Miles short of MAS-Beypore & 238 Miles shy of MAQ (Finished in 1907)!!
I hope its not a presumption and there must be some train's TT as back up which you link as progression of 46 long years gap of non existence of Through Train/Coach & Rail Network!! click here Tells in 1888 at 18:00 some train DEP MAS which was forerunner to 1 MAS-MAQ Mail!!
I show you non existence of Mail or Interclass Fare in...
more...
I hope its not a presumption and there must be some train's TT as back up which you link as progression of 46 long years gap of non existence of Through Train/Coach & Rail Network!! click here Tells in 1888 at 18:00 some train DEP MAS which was forerunner to 1 MAS-MAQ Mail!!
I show you non existence of Mail or Interclass Fare in...
more...
1 Public Posts - Fri Jun 18, 2021
1 Public Posts - Sun Jun 20, 2021
1 Public Posts - Sun Jun 27, 2021
1 Public Posts - Thu Jul 01, 2021
1 Public Posts - Fri Jul 02, 2021
Pic 3: Bypore Mail: 1863-64 Through as GDs, Sep 1865 No Mail Allowance from Bombay/Beypore till Line completes, 1867-68-69 Ord/Mail (2 trains to Beypore) , 1870 MAS/SBC/RC-CBE Night + PDJ-Beypore Morning Mail, Jan 1880 PDJ-Byepore Mail Discontinued (MAS Through Coach demolished), 1880-81 PDJ-Beypore Ord demolished (PDJ-Beypore left with no Train)
Pic 1: 1875-76: No through Mail to Beypore, Pic 2: 1889: Through Mail to Calicut, click here 5 March 1888: MAS-CLT Connected with Ferry near CLT, 1890 Through Connection to CLT (Through Mail started at 18:00 ex MAS, Become Malabar Exp with SRR-ERS Link for MAS & MAQ)
1...
more...
Pic 1: 1875-76: No through Mail to Beypore, Pic 2: 1889: Through Mail to Calicut, click here 5 March 1888: MAS-CLT Connected with Ferry near CLT, 1890 Through Connection to CLT (Through Mail started at 18:00 ex MAS, Become Malabar Exp with SRR-ERS Link for MAS & MAQ)
1...
more...
1 Public Posts - Sat Jul 03, 2021
1 Public Posts - Sun Jul 25, 2021
1 Public Posts - Tue Feb 21, 2023