Search Forum
Blog Entry# 5022038
Posted: Jul 22 2021 (12:46)
9 Responses
Last Response: Jul 23 2021 (11:31)
9 Responses
Last Response: Jul 23 2021 (11:31)
Jul 22 2021 (12:46) PUNE/Pune Junction (6 PFs)
TouristerDivyanshu^~
TouristerDivyanshu^~ 172569 blog postsMumbai Pune railway Ghat section pictures this morning
PC: Mid Day
PC: Mid Day
8 Public Posts - Thu Jul 22, 2021
Back when the line was non-electrified, we had steam locos in the country.
With steam, the issue is active propulsion power is generated only at one wheel and rest of the wheels are rotated by means of crank. This leads to rather poor adhesion figures and less than optimal TE even though they generate substantial amounts of torque. The outcome is that there is a limit to how steep a grade it could ascend. This is how we got reversing lines on both thull and bhor ghat.
It is no wonder mumbai bound...
more...
With steam, the issue is active propulsion power is generated only at one wheel and rest of the wheels are rotated by means of crank. This leads to rather poor adhesion figures and less than optimal TE even though they generate substantial amounts of torque. The outcome is that there is a limit to how steep a grade it could ascend. This is how we got reversing lines on both thull and bhor ghat.
It is no wonder mumbai bound...
more...