Search Forum
Blog Entry# 5026142
Posted: Jul 27 2021 (19:38)
6 Responses
Last Response: Sep 30 2021 (14:01)
6 Responses
Last Response: Sep 30 2021 (14:01)
IR Affairs
NR/Northern
AdittyaaSharma^~ 71370 news posts
Trial run program of RDSO special was issued to be executed on 27.7.2021 and 28.7.2021 over LKO-ON-LKO section. But GM NR/NDLS permit to conduct the trial...
read more... RDSO Special trials for 250 km/hr fit coaches
3 Public Posts - Tue Jul 27, 2021
1 Public Posts - Wed Jul 28, 2021
** headline says that the under trial coaches are fit for 250kmph speed, but the report is silent on the speed at which trials shall be conducted.
** Trials at 180kmph has been conducted in patches mostly falling in Mathura-Kota section with Talgo as well as LHB rakes. Speed beyond 180 kmph is probably not safe on the IR tracks designed for maximum speed of 160kmph.
** A high speed test track is under construction near Jodhpur to facilitate trials at higher speed .
** Trials at 180kmph has been conducted in patches mostly falling in Mathura-Kota section with Talgo as well as LHB rakes. Speed beyond 180 kmph is probably not safe on the IR tracks designed for maximum speed of 160kmph.
** A high speed test track is under construction near Jodhpur to facilitate trials at higher speed .
1 Public Posts - Thu Sep 30, 2021