Search Forum
Blog Entry# 5028171
Posted: Jul 30 2021 (11:36)
7 Responses
Last Response: Jul 31 2021 (11:05)
7 Responses
Last Response: Jul 31 2021 (11:05)
Jul 30 2021 (11:36) 06272X/Bidar - Yesvantpur Special | BIDR/Bidar (3 PFs)
ssastronaut~
ssastronaut~ 920 blog posts#InfoUpdate #News #NewLine
Perhaps for the 1st time, IR has cancelled/shelved/dropped new line project which appeared in Pink book with positive ROR and later found out to be non viable after DPR preparation.
As per the answer given by RM in LS, new Nanded-Bidar project has been dropped(?) by IR because of non viability. Strange!
Perhaps for the 1st time, IR has cancelled/shelved/dropped new line project which appeared in Pink book with positive ROR and later found out to be non viable after DPR preparation.
As per the answer given by RM in LS, new Nanded-Bidar project has been dropped(?) by IR because of non viability. Strange!
1 Public Posts - Fri Jul 30, 2021
I read some time back that Latur road Nanded line is proposed. There is no need to have two lines in a short distance.
2 Public Posts - Fri Jul 30, 2021
3 Public Posts - Sat Jul 31, 2021