Konkan Railway Corporation Ltd. (KRCL) completed line doubling work on a 46.8 km stretch between Roha under Central Railway and Veer (KRCL) on Monday.
...
...
read more... Line doubling completed on Roha-Veer section
3 Posts
** KR has the expertise of handling new rail line projects in hilly terrains, especially in long tunnel construction.
** But IR is not giving due consideration to capacity augmentation of KR
It is neglected even in the futuristic National rail plan-2030
** But IR is not giving due consideration to capacity augmentation of KR
It is neglected even in the futuristic National rail plan-2030
** KR deserves to be part of famed and very important "national Heavily Utilised (HUN) Network", for that to happen KR needs to be merged with IR or IR has to take initiative & actively support KR in this regard.
**
Following expansions/extensions need to be completed in next 10 years and should have been a part of "National Rail Plan"
- Doubling of...
more...
**
Following expansions/extensions need to be completed in next 10 years and should have been a part of "National Rail Plan"
- Doubling of...
more...
KR regional connectivity well explained...
KR has identified 3 sections for future Doubling, these are...
Vaibhavwadi Rd to Madure ( Maha-GOA border) : 88 kms
Madgaon to Balli : 16 kms
Udupi to Thokur...
more...
KR has identified 3 sections for future Doubling, these are...
Vaibhavwadi Rd to Madure ( Maha-GOA border) : 88 kms
Madgaon to Balli : 16 kms
Udupi to Thokur...
more...
**During the period of Mr Prabhu, it was reported that the doubling shall be done simultaneously in a few more stretches in addition to Roha-Veer, but that could not materialize.
** KR want to do doubling of long tunnels in the last phase to double maximum route KMs at minimum cost in shorter time.
** KR want to do doubling of long tunnels in the last phase to double maximum route KMs at minimum cost in shorter time.