Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Eat-Sleep-Railfanning 🔄 Repeat - Shankar Mehani

Search Forum
<<prev entry    next entry>>
Blog Entry# 517473
Posted: Sep 01 2012 (12:35)

17 Responses
Last Response: Sep 02 2012 (05:45)
General Travel
2398 views
5

Sep 01 2012 (12:35)  
 
PKV~
PKV~   25536 blog posts
Entry# 517473              
On the route from MAS to ERS/TVC/MAQ, the distance indicators on electric poles start with 0 at MAS and move progressively to Arakkonam (69), Katpadi (129), Jolarpettai (213), Salem (333), Erode(395) and then Irugur (478). Thereafter the line branches out into two sections. The line on the left moves straight to Podanur (489) and beyond to Palakkad (539) (skirting Coimbatore Main). But the one on the right moves via Singanallur, Pilamedu, Coimbatore North and on to Coimbatore Junction (CBE).
However, on the right hand side line, the distance marking starts afresh at 0 from Irugur culminating in 18 at CBE, as observed by me at PF 4 at CBE, on 23rd August, as I was waiting to board the 16614 CBE-Rajkot
...
more...
Express to KR Puram. Another 5 kms away the line rejoins the main line at Podanur, which is 489 kms from MAS bypassing CBE and 501 kms via CBE.
wWhy this curious instance of fresh numbering from 0 between Irugur and CBE is probably explained by the fact that this line came much later when the track via CBE was laid. The original MALABAR line laid by the British bypassed CBE and may therefore be considered to be the MAIN LINE.
(This one is specially for Anand Nambyar** and Pramod**, who happens to a frequent flier sorry RAILER on this route.

Translate to English
Translate to Hindi

14 Posts

584 views
0

Sep 01 2012 (21:50)
PKV~
PKV~   25536 blog posts
Re# 517473-15              
Thanks for this info Tejas. Waiting for an explanation from those in the know of things.
Translate to English
Translate to Hindi

582 views
0

Sep 01 2012 (22:12)
NazeerCbe^~
NazeerCbe^~   12196 blog posts
Re# 517473-18              
Pf# 3 and 4 are on both sides the main building. Pf# 1 is missing now as the gauge conversion is in progress. Earlier we have to cross the 1 and 2 pf to board the broad gauge trains. Now the 1 first pf is converted as the entrance,booking counter etc,then we will be entering to 2 nd pf which is under gauge conversion now towards pollachi.
Translate to English
Translate to Hindi

746 views
0

Sep 02 2012 (05:45)
TejasS~
TejasS~   8592 blog posts
Re# 517473-19              
Thank you Dr Nazeer.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy