Jan 13 2023 (23:35)
HarshaI22159^~
FM Term Over 10560 blog postsEntry# 5600561 Past Edits
Aug 06 2023 (12:05)
1) LAST UPDATED:05/08/2023 06/08/2023 04:08PM 12:05PM
*Aurangabad – 1 New Pit line (17 ICF/15 LHB)(Sanctioned/Construction (Under Not Construction) Started)
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
Aug 05 2023 (16:08)
1) LAST UPDATED:20/07/2023 05/08/2023 11:05PM 04:08PM
*Jalna – 1 New Pit line (30 ICF/27 LHB)(Under (Nearly Construction) Completed)
*Adilabad – 1 New Pit line (26 ICF/24 LHB)(Sanctioned (Under And Construction) Construction work going on)
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
Jul 20 2023 (23:05)
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
Jul 20 2023 (23:05)
1) LAST UPDATED: 20/07/202311:00PM 11:05PM
NEW: 4 Pitlines (3 16 ICF / 14 LHB 1 12 Coach ICF EMU Rake pitline)
Kolhapur - 2 Pit line (1 24 ICF / 21 LHB, 122ICF, 22 ICF / 19 LHB)
(NEW Kotegangur: PITLINES Pitline WERE Construction TO going BE on SANCTIONED AT Kotegangur)
Belagavi Pitline:Limits 1 Unknown Pitline 27 ICF/26 LHB
Vijayapura Vijayapura: (NEW Under PITLINE Construction SANCTIONED, Status Unknown)
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
Jul 20 2023 (23:00)
1) LAST UPDATED: 20/07/202308:55PM 11:00PM
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
Jul 20 2023 (21:01)
BelagaviPitline Pitline: has Limits become Unknown operational Don't know limits
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
Jul 20 2023 (20:55)
1) LAST UPDATED:17/05/2023 20/07/2023 10:50PM 08:55PM
Machilipatnam: 2 Pitlines( – LIMITS Both UNKNOWN 24 ) ICF/22 LHB
Narsapur: 2 Pitlines, ONE Dilapidated so replacement proposed with one newpitline) pitlines
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
Jul 20 2023 (20:50)
Kakinada Port Coaching Depot – 3 Pitlines - (ALL 24 ICF/22 LHB), + 2Pit Stabling lines (1-26 ICF/23 LHB, 1-23 ICF/21 LHB) + 1 New Pit line (24 ICF/22 LHB)
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
May 17 2023 (22:51)
1) LAST UPDATED:14/05/2023 17/05/2023 08:02PM 10:50PM
Palakkad Town: 1 NEW Pitline under construction
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
May 14 2023 (20:04)
1)if LAST any UPDATED: station 14/05/2023 is 08:02PM missing or any info is wrong, let me know
2) Source: and other blogs
3) All Info will be updated as Zone Wise Parts)
4) LAST UPDATED: 14/05/2023 07:35PM
2) if any station is missing or any info is wrong, let me know
3) Source: and other blogs
4) All Info will be updated as Zone Wise Parts
Jheel Siding Coaching Depot (Howrah): 5 Pitlines (1 13 ICF/11 LHB) +4 2 Pitlines (ALL 26 ICF/24 LHB) + 2 New Pitlines Commissioned, The 3 old pitlines are considered for upgradation
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
May 14 2023 (20:01)
Jheel Siding Coaching Depot (Howrah):1 5 Pitline Pitlines (13 (1 13 ICF/11 LHB) + 2 4 New Pitlines Pit lines ICF/24 LHB) (Under Construction)
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
May 14 2023 (19:35)
4) LAST UPDATED:11/05/2023 14/05/2023 01:52AM 07:35PM
17 ICF/16 LHB, 2 17 ICF/15 LHB)+ 4 NEW PITLINES PROPOSED
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
May 11 2023 (01:52)
4) LAST UPDATED:10/05/2023 11/05/2023 09:27PM 01:52AM
Tambaram –2 4 Pit Pitlines lines ICF/24 LHB) + 2 New Pit lines (26 ICF/24 LHB) (Under Construction) + 1 NEW PITLINE Sanctioned
Bijwasan (Delhi): 5 New Pitlines (ALL 27 ICF / 25 LHB) (UNDER Construction as of last update)
Lucknow Charbagh: 6 Pitlines (1 26 ICF / 24 LHB, 1 26 ICF/ 1 18 ICF, 1 17 ICF, 1 15 ICF, 1 12ICF) ICF
Varanasi Ayodhya City: Cantt: 3 Pitlines (1 21 ICF / 08 ICF)
Ayodhya Cantt: 3 Pitlines (1 21 ICF / 08 ICF)
7-DUmbala Ambala Cantt
Umbala Ambala Cantt – 2 Pit lines (1-17 ICF/16 LHB, 1-13 ICF/12 LHB) + 1 New Pit line (24 ICF/22 LHB) (Proposed)
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
May 10 2023 (21:30)
4) LAST UPDATED: 10/05/2023 09:27PM
This counter will be updated as i add more info, so that my updates are transparent to everyone
7) NORTHERN RAILWAYS:
7-A Delhi Division:
Old Delhi (DLI): 4 Pitlines (1 26 ICF / 25 LHB, 1 25 ICF/ 24 LHB, 2 23 ICF/21 LHB)
New Delhi (NDLS): 13 Pitlines (2 28 ICF / 26 LHB, 5 27 ICF/25 LHB, 2 27 ICF/25 LHB, 1 22 ICF/20 LHB, 1 21 ICF/19 LHB, 1 16 ICF / 15 LHB, 1 10 ICF / 9 LHB)
Hazrat Nizamuddin (NZM): 6 Pitlines (5 26 ICF / 24 LHB, 1 27 ICF/25 LHB)
Delhi Sarai Rohilla (DEE): 5 Pitlines (ALL 27 ICF/25 LHB)
Anand Vihar Term: 5 Pitlines (ALL 26 ICF / 24 LHB)
Shakurbasti: 2 Pitlines (ALL 26 ICF / 24 LHB)
Bijwasan (Delhi): 5 New Pitlines (ALL 27 ICF / 25 LHB) (UNDER Construction as of last update)
MTC/Meerut City: 1 Pitline (24 ICF / 22 LHB)
JIND: 1 Pitline (18 ICF / 17 LHB)
Panipat: 1 Pitline (14 ICF / 13 LHB)
7-B Lucknow NR Division:
Lucknow Charbagh: 6 Pitlines (1 26 ICF / 24 LHB, 1 26 ICF/ 1 18 ICF, 1 17 ICF, 1 15 ICF, 1 12 ICF)
Varanasi Jn: 4 Pitlines: 1 26 ICF / 24 LHB, 1 26 ICF, 2 22 ICF) + 2 NEW Pitlines (26 ICF / 24 LHB) (Under Construction)
Varanasi City:
Ayodhya Cantt: 3 Pitlines (1 21 ICF / 08 ICF)
Sultanpur: 2 Pitlines (ALL 26 ICF / 24 LHB)
Rae Bareli: 1 Pitline (14 ICF) + 2 New Pitlines (Both 26 ICF / 24 LHB)
Pratapgarh – 1 Pit line (8 ICF) + 1 New Pit line (26 ICF/24 LHB) (Under Construction)
Prayagraj Sangam – 2 Pit lines (Each 26 ICF/24 LHB)
7-C Firozpur Division:
Firozpur Cantt – 2 Pit lines (Each 24 ICF/22 LHB)
Amritsar – 6 Pit lines (2 26 ICF/24 LHB, 1 25 ICF/24 LHB, 1 22 ICF/20 LHB, 1 21 ICF/19 LHB, 1 18 ICF/16 LHB)
Chheharta (Amritsar) – 2 Pit lines (ALL 27 ICF/26 LHB)
Jammu Tawi – 3 Pit lines (ALL 24 ICF/22 LHB)
SVDK (Katra) – 2 Pit lines (ALL 26 ICF/24 LHB)
Moradabad Division:
Bareilly Junction – 3 Pit lines (1-24 ICF/22 LHB, 1-18 ICF/16 LHB, 1-16 ICF/14 LHB) + 2 New Pit lines (Under Construction)
Dehradun – 2 Pit lines (Each 19 ICF/17 LHB)
Yog Nagari Rishikesh – 2 Pit lines (ALL 26 ICF/24 LHB)
Haridwar – 2 Pit lines (1 24 ICF/22 LHB, 1 22 ICF/20 LHB)
Moradabad – 2 Pit lines (1 13 ICF/12 LHB, 1 09 ICF/08 LHB)
Najibabad – 1 Pit line (13 ICF/12 LHB)
Balamau – 2 Pit lines (1 10 ICF/09 LHB, 1 07 ICF/09 LHB)
7-D Umbala Cantt
Division:
Chandigarh – 2 Pit lines (Each 25 ICF/24 LHB)
Umbala Cantt – 2 Pit lines (1-17 ICF/16 LHB, 1-13 ICF/12 LHB) + 1 New Pit line (24 ICF/22 LHB) (Proposed)
Saharanpur – 2 Pit lines (Each 13 ICF/12 LHB)
Bathinda – 2 Pit lines (1-14 ICF/13 LHB, 1-11 ICF/10 LHB)
Nangal Dam – 1 Pit line (15 ICF/14 LHB)
Kalka – 2 Pit lines (1-13 ICF/12 LHB, 1-12 ICF/11 LHB)
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
Jan 16 2023 (09:40)
*Aurangabad – 1 New Pit line (17 ICF/15 LHB)(Sanctioned (Sanctioned/Construction and Not Under Started) construction)
Bokaro Steel City 1 Pitline DILAPIDATED
Jan 15 2023 (19:55)
*Aurangabad – 1 New Pit line (17 ICF/15 LHB)(No (Sanctioned Idea/Sanctioned) and Under construction)
*Jalna – 1 New Pit line (30 ICF/27 LHB)(No (Under Idea/Under
Santragachi Coaching Depot: 11 Pitlines (1 25 ICF/23 LHB, 3 24 ICF,22 LHB, 2 23 ICF, 20LHBM LHB, 22 ICF/19 LHB, 2 20 ICF/18 LHB, 1 19 ICF/18 LHB, 1 17 ICF, 16 LHB)
Bokaro Steel City 1 Pitline DILAPIDATED
Jan 15 2023 (19:37)
*Adilabad – 1 New Pit line (26 ICF/24 LHB)(No (Sanctioned Idea/Sanctioned) And Construction work going on)
Bokaro Steel City 1 Pitline DILAPIDATED
Jan 15 2023 (19:23)
2 New Integrated Pit lines (Each 29 ICF/26 LHB) (Under Construction)(Kindly let me know the status)
Kakinada Port Coaching Depot – 2 Pit lines (1-26 ICF/23 LHB, 1-23 ICF/21 LHB) + 1 New Pit line (24 ICF/22 LHB)\
(Under Construction)
(New Machilipatnam: 2 Pitlines have ( been LIMITS proposed UNKNOWN at ) NS, Kindly let me know the status)
Narsapur: 2 Pitlines, ONE Dilapidated so replacement proposed with one new pitline)
Nallapadu Coaching Depot – 1 Pit line (33 ICF/30 LHB) (NOT OPERATIONAL)
Bokaro Steel City 1 Pitline DILAPIDATED
Jan 15 2023 (01:10)
1-A) Mumbai CSMTDiv: Division:
3) SOUTH CENTRAL RAILWAYS
3-A Secunderabad Division
Secunderabad Coaching Depot: 6 Pitlines (4 26 ICF/24 LHB, 1 24 ICF/ 22 LHB, 1 23 ICF, 21 LHB)
Hyderabad Coaching Depot: 7 Pitlines (2 24 ICF/22 LHB, 1 16 ICF/ 14 LHB, 1 15 ICF/13 LHB)
Charlapalli Coaching Depot: 4 Pit lines (ALL 26 ICF/24 LHB)
Kazipet Coaching Depot: 4 Pit lines (2 29 ICF/26 LHB, 2 10 ICF/09 LHB)
Khanapur: 1 Pitine (24 ICF/22 LHB)
Bhadrachalam Road: 1 Pit line (16 ICF/14 LHB)
3-B Hyderabad Division:
Kacheguda Coaching Depot: 3 Pit lines (2 25 ICF/22 LHB, 1 23 ICF/21 LHB)
3-C Vijayawada Division
Vijayawada Coaching Depot – 5 Pit lines (2 25 ICF/23 LHB, 1 24 ICF/21 LHB, 1 13 ICF/12 LHB, 1 10 ICF/09 LHB) +
2 New Integrated Pit lines (Each 29 ICF/26 LHB) (Under Construction) (Kindly let me know the status)
Kakinada Port Coaching Depot – 2 Pit lines (1-26 ICF/23 LHB, 1-23 ICF/21 LHB) + 1 New Pit line (24 ICF/22 LHB) \
(Under Construction)
(New Pitlines have been proposed at NS, Kindly let me know the status)
3-D Guntur Division:
Guntur Coaching Depot – 2 Pit lines (1 25 ICF/22 LHB, 1 24 ICF/22 LHB)
Nallapadu Coaching Depot – 1 Pit line (33 ICF/30 LHB)
3-E Guntakal Division:
Tirupati Coaching Depot – 5 Pit lines (1 25 ICF/23 LHB, 3 24 ICF/22 LHB, 1 22 ICF/20 LHB)
Renigunta – 1 Pit line (3 ICF)
Guntakal – 1 Pit line (10 ICF/09 LHB)
f) Nanded Division:
• Nanded Coaching Depot – 3 Pit lines (1-24 ICF/23 LHB, 1-21 ICF/19 LHB, 1-20 ICF/18 LHB)
Purna – 1 Pit line (18 ICF/17 LHB)
*Aurangabad – 1 New Pit line (17 ICF/15 LHB) (No Idea/Sanctioned)
*Jalna – 1 New Pit line (30 ICF/27 LHB) (No Idea/Under Construction)
*Adilabad – 1 New Pit line (26 ICF/24 LHB) (No Idea/Sanctioned)
(More 5) Zones EASTERN will RAILWAYS: be added as i find out more updated info, SCR is ready but many constructions are being shown and i cant find much info, so temporarily holding them off until i can get my doubts cleared by those members)
5-A Howrah Division:
Tikiapara Coaching Depot (HWH): 15 Pitlines (2 26 ICF/24 LHB, 3 24 LHB/22 ICF, 2 23 ICF/21 LHB,
2 21 ICF/19 LHB, 2 19 ICF/17 LHB, 1 18 ICF/16 LHB,
17 ICF/16 LHB, 2 17 ICF/15 LHB) + 4 NEW PITLINES PROPOSED
Liluah Coaching Depot/Sorting Yard (HWH): 10 Pitlines (1 26 ICF/24 LHB, 7 24 ICF/22 LHB, 1 22 ICF/20 LHB,
1 12 ICF/10 LHB)
Jheel Siding Coaching Depot (Howrah): 1 Pitline (13 ICF/11 LHB) + 2 New Pit lines (ALL 26 ICF/24 LHB) (Under Construction)
Bardhhaman Jn: 2 Pitlines (ALL 8 ICF/6 LHB)
Azimganj: 2 Pitlines (ALL 09 ICF/07 LHB)
5-B Sealdah Division:
Sealdah: 8 Pitlines 3 24 ICF/22 LHB), 1 23 ICF/21 LHB, 3 22 ICF/ 21 LHB, 1 18 ICF/16 LHB)
Kolkata Terminal: 3 Pitlines (2 24 ICF ICF/22 LHB, 1 21 ICF / 19 LHB) + 1 New Pitline (13 ICF + 12 LHB) Under Construction
5-C Asansol Division:
Asansol: 4 Pitlines (3 24 ICF/22 LHB, 1 20 ICF/18 LHB)
Madhupur: NEW PITLINE (24 ICF / 22 LHB) UNDER Construction
Deoghar: NEW PITLINE (14 ICF/ 12 LHB) Under Construction
5-D Malda Town Division:
Malda Town: 3 Pitlines (ALL 24 ICF / 22 LHB)
Bhagalpur: 3 Pitlines (2 24 ICF/22 LHB, 1 20 ICF/18 LHB) + 1 New Pitline (24 ICF/22 LHB) Under Construction
Godda: PITLINE Under Construction (24 ICF/22 LHB)
Jamalpur: (17 ICF)
Sahibganj: (12 ICF)
6) SOUTH EASTERN RAILWAYS:
6-A Kharagpur Division
Santragachi Coaching Depot: 11 Pitlines (1 25 ICF/23 LHB, 3 24 ICF,22 LHB, 2 23 ICF, 20 LHBM 22 ICF/19 LHB, 2 20 ICF/18 LHB, 1 19 ICF/18 LHB, 1 17 ICF, 16 LHB)
Padmapukur Coaching depot: 3 Pitlines (ALL 26 ICF/24 LHB)
Kolkata Shalimar Coaching Depot: 2 New Pitlines (ALL 24 ICF/22 LHB) (Under construction)
Kharagpur Coach Depot: 2 pitlines (1 18 ICF / 16 LHB, 1 15 ICF/13 LHB)
6-B Ranchi Division:
Hatia Coaching Depot (Ranchi): 8 Pitlines (2 26 ICF/24 LHB, 4 24 ICF/22 LHB, 1 15 ICF/14 LHB, 1 14 ICF/13 LHB)
6-C Chakradharpur Division:
Tatanagar: 3 Pitlines (ALL 26ICF / 24 LHB)
Rourkela Coaching Depot: 2 Pitlines (1 24 ICF / 22LHB, 1 17 ICF,15 LHB)
Jharsuguda Coaching Depot: 1 Pitline (DILAPIDATED)
6-D Adra Division
Adra: 1 Pitline
Bokaro Steel City 1 Pitline DILAPIDATED
Jan 14 2023 (15:37)
(More Zones will be added as i find out more updated info, SCRand is SR Are many constructions are being shown and i cant find much info, so temporarily holding them off until i can get my doubts cleared by those members)
Jan 14 2023 (15:36)
Manjatidal (TPJ): NEW MEMU Shed under construction
(More Zones will be added as i find out more updated info, SCR and SR Are ready but many constructions are being shown and i cant find much info, so temporarily holding them off until i can get my doubts cleared by those members)
Jan 14 2023 (12:29)
4) SOUTHERN RAILWAY:
4-A Chennai Division:
Basin Bridge Coach Care Complex (Chennai Central) – 16 Pit lines (6 24 ICF/24 LHB, 4 21 ICF/19 LHB, 2 20 ICF/18 LHB, 2 19 ICF/17 LHB, 2 15 ICF/13 LHB)
Gopalswamy Nagar Coaching Depot (Chennai Egmore) – 3 Pit lines (1 26 ICF/24 LHB, 1 24 ICF/22 LHB, 1 18 ICF/16 LHB)
Tambaram – 2 Pit lines (26 ICF/24 LHB) + 2 New Pit lines (26 ICF/24 LHB) (Under Construction) + 1 NEW PITLINE Sanctioned
4-B Madurai Division:
Madurai – 4 Pit lines (3-26 ICF/24 LHB, 1-24 ICF/22 LHB)
Tirunelveli – 3 Pit lines (Each 26 ICF/24 LHB)
Rameswaram – 2 Pit lines (Each 26 ICF/24 LHB) (NEW Pitline SANCTIONED)
Tuticorin – 1 Pit line (21 ICF/19 LHB)
4-C Tiruchchirappalli Division:
Tiruchchirappalli – 3 Pit lines (2-24 ICF/22 LHB, 1-13 ICF/11 LHB)
Villupuram – 1 Pit line (26 ICF/24 LHB)
4-D Salem Division:
Coimbatore – 2 Pit lines (Each 26 ICF/24 LHB)
Erode – 2 Pit lines (1 24 ICF/22 LHB, 1 10 ICF/8 LHB)
4-E Thiruvananthapuram Division:
Thiruvananthapuram – 5 Pit lines (1-26 ICF/24 LHB, 2-24 ICF/22 LHB, 1-20 ICF/18 LHB)
Kochuveli – 3 Pit lines (Each 24 ICF/22 LHB)
Nagercoil – 3 Pit lines (Each 26 ICF/24 LHB)+ 2 New Pit lines (26 ICF/24 LHB) (Under Construction)
Ernakulam – 3 Pit lines (Each 26 ICF/24 LHB)
Alappuzha – 1 Pit line (18 ICF/16 LHB)
4-F Palakkad (Palghat) Division:
Mangalore Central – 3 Pit lines (2 24 ICF/22 LHB, 1 18 ICF/16 LHB) + 1 New Pit line (24 ICF/22 LHB) (Under Construction)
Shoranur – 1 Pit line (12 ICF/10 LHB)
1) LAST UPDATED:
*Aurangabad – 1 New Pit line (17 ICF/15 LHB)
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
Aug 05 2023 (16:08)
1) LAST UPDATED:
*Jalna – 1 New Pit line (30 ICF/27 LHB)
*Adilabad – 1 New Pit line (26 ICF/24 LHB)
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
Jul 20 2023 (23:05)
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
Jul 20 2023 (23:05)
1) LAST UPDATED: 20/07/2023
NEW: 4 Pitlines (3 16 ICF / 14 LHB 1 12 Coach ICF EMU Rake pitline)
Kolhapur - 2 Pit line (1 24 ICF / 21 LHB, 1
Belagavi Pitline:
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
Jul 20 2023 (23:00)
1) LAST UPDATED: 20/07/2023
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
Jul 20 2023 (21:01)
Belagavi
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
Jul 20 2023 (20:55)
1) LAST UPDATED:
Machilipatnam: 2 Pitlines
Narsapur: 2 Pitlines, ONE Dilapidated so replacement proposed with one new
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
Jul 20 2023 (20:50)
Kakinada Port Coaching Depot – 3 Pitlines - (ALL 24 ICF/22 LHB), + 2
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
May 17 2023 (22:51)
1) LAST UPDATED:
Palakkad Town: 1 NEW Pitline under construction
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
May 14 2023 (20:04)
1)
2) if any station is missing or any info is wrong, let me know
3) Source: and other blogs
4) All Info will be updated as Zone Wise Parts
Jheel Siding Coaching Depot (Howrah): 5 Pitlines (1 13 ICF/11 LHB) +
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
May 14 2023 (20:01)
Jheel Siding Coaching Depot (Howrah):
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
May 14 2023 (19:35)
4) LAST UPDATED:
17 ICF/16 LHB, 2 17 ICF/15 LHB)
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
May 11 2023 (01:52)
4) LAST UPDATED:
Tambaram –
Bijwasan (Delhi): 5 New Pitlines (ALL 27 ICF / 25 LHB) (UNDER Construction as of last update)
Lucknow Charbagh: 6 Pitlines (1 26 ICF / 24 LHB, 1 26 ICF/ 1 18 ICF, 1 17 ICF, 1 15 ICF, 1 12
7-D
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
May 10 2023 (21:30)
4) LAST UPDATED: 10/05/2023 09:27PM
This counter will be updated as i add more info, so that my updates are transparent to everyone
7) NORTHERN RAILWAYS:
7-A Delhi Division:
Old Delhi (DLI): 4 Pitlines (1 26 ICF / 25 LHB, 1 25 ICF/ 24 LHB, 2 23 ICF/21 LHB)
New Delhi (NDLS): 13 Pitlines (2 28 ICF / 26 LHB, 5 27 ICF/25 LHB, 2 27 ICF/25 LHB, 1 22 ICF/20 LHB, 1 21 ICF/19 LHB, 1 16 ICF / 15 LHB, 1 10 ICF / 9 LHB)
Hazrat Nizamuddin (NZM): 6 Pitlines (5 26 ICF / 24 LHB, 1 27 ICF/25 LHB)
Delhi Sarai Rohilla (DEE): 5 Pitlines (ALL 27 ICF/25 LHB)
Anand Vihar Term: 5 Pitlines (ALL 26 ICF / 24 LHB)
Shakurbasti: 2 Pitlines (ALL 26 ICF / 24 LHB)
Bijwasan (Delhi): 5 New Pitlines (ALL 27 ICF / 25 LHB) (UNDER Construction as of last update)
MTC/Meerut City: 1 Pitline (24 ICF / 22 LHB)
JIND: 1 Pitline (18 ICF / 17 LHB)
Panipat: 1 Pitline (14 ICF / 13 LHB)
7-B Lucknow NR Division:
Lucknow Charbagh: 6 Pitlines (1 26 ICF / 24 LHB, 1 26 ICF/ 1 18 ICF, 1 17 ICF, 1 15 ICF, 1 12 ICF)
Varanasi Jn: 4 Pitlines: 1 26 ICF / 24 LHB, 1 26 ICF, 2 22 ICF) + 2 NEW Pitlines (26 ICF / 24 LHB) (Under Construction)
Varanasi City:
Ayodhya Cantt: 3 Pitlines (1 21 ICF / 08 ICF)
Sultanpur: 2 Pitlines (ALL 26 ICF / 24 LHB)
Rae Bareli: 1 Pitline (14 ICF) + 2 New Pitlines (Both 26 ICF / 24 LHB)
Pratapgarh – 1 Pit line (8 ICF) + 1 New Pit line (26 ICF/24 LHB) (Under Construction)
Prayagraj Sangam – 2 Pit lines (Each 26 ICF/24 LHB)
7-C Firozpur Division:
Firozpur Cantt – 2 Pit lines (Each 24 ICF/22 LHB)
Amritsar – 6 Pit lines (2 26 ICF/24 LHB, 1 25 ICF/24 LHB, 1 22 ICF/20 LHB, 1 21 ICF/19 LHB, 1 18 ICF/16 LHB)
Chheharta (Amritsar) – 2 Pit lines (ALL 27 ICF/26 LHB)
Jammu Tawi – 3 Pit lines (ALL 24 ICF/22 LHB)
SVDK (Katra) – 2 Pit lines (ALL 26 ICF/24 LHB)
Moradabad Division:
Bareilly Junction – 3 Pit lines (1-24 ICF/22 LHB, 1-18 ICF/16 LHB, 1-16 ICF/14 LHB) + 2 New Pit lines (Under Construction)
Dehradun – 2 Pit lines (Each 19 ICF/17 LHB)
Yog Nagari Rishikesh – 2 Pit lines (ALL 26 ICF/24 LHB)
Haridwar – 2 Pit lines (1 24 ICF/22 LHB, 1 22 ICF/20 LHB)
Moradabad – 2 Pit lines (1 13 ICF/12 LHB, 1 09 ICF/08 LHB)
Najibabad – 1 Pit line (13 ICF/12 LHB)
Balamau – 2 Pit lines (1 10 ICF/09 LHB, 1 07 ICF/09 LHB)
7-D Umbala Cantt
Division:
Chandigarh – 2 Pit lines (Each 25 ICF/24 LHB)
Umbala Cantt – 2 Pit lines (1-17 ICF/16 LHB, 1-13 ICF/12 LHB) + 1 New Pit line (24 ICF/22 LHB) (Proposed)
Saharanpur – 2 Pit lines (Each 13 ICF/12 LHB)
Bathinda – 2 Pit lines (1-14 ICF/13 LHB, 1-11 ICF/10 LHB)
Nangal Dam – 1 Pit line (15 ICF/14 LHB)
Kalka – 2 Pit lines (1-13 ICF/12 LHB, 1-12 ICF/11 LHB)
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
Jan 16 2023 (09:40)
*Aurangabad – 1 New Pit line (17 ICF/15 LHB)
Bokaro Steel City 1 Pitline DILAPIDATED
Jan 15 2023 (19:55)
*Aurangabad – 1 New Pit line (17 ICF/15 LHB)
*Jalna – 1 New Pit line (30 ICF/27 LHB)
Santragachi Coaching Depot: 11 Pitlines (1 25 ICF/23 LHB, 3 24 ICF,22 LHB, 2 23 ICF, 20
Bokaro Steel City 1 Pitline DILAPIDATED
Jan 15 2023 (19:37)
*Adilabad – 1 New Pit line (26 ICF/24 LHB)
Bokaro Steel City 1 Pitline DILAPIDATED
Jan 15 2023 (19:23)
2 New Integrated Pit lines (Each 29 ICF/26 LHB) (Under Construction)
Kakinada Port Coaching Depot – 2 Pit lines (1-26 ICF/23 LHB, 1-23 ICF/21 LHB) + 1 New Pit line (24 ICF/22 LHB)
Narsapur: 2 Pitlines, ONE Dilapidated so replacement proposed with one new pitline)
Nallapadu Coaching Depot – 1 Pit line (33 ICF/30 LHB) (NOT OPERATIONAL)
Bokaro Steel City 1 Pitline DILAPIDATED
Jan 15 2023 (01:10)
1-A) Mumbai CSMT
3) SOUTH CENTRAL RAILWAYS
3-A Secunderabad Division
Secunderabad Coaching Depot: 6 Pitlines (4 26 ICF/24 LHB, 1 24 ICF/ 22 LHB, 1 23 ICF, 21 LHB)
Hyderabad Coaching Depot: 7 Pitlines (2 24 ICF/22 LHB, 1 16 ICF/ 14 LHB, 1 15 ICF/13 LHB)
Charlapalli Coaching Depot: 4 Pit lines (ALL 26 ICF/24 LHB)
Kazipet Coaching Depot: 4 Pit lines (2 29 ICF/26 LHB, 2 10 ICF/09 LHB)
Khanapur: 1 Pitine (24 ICF/22 LHB)
Bhadrachalam Road: 1 Pit line (16 ICF/14 LHB)
3-B Hyderabad Division:
Kacheguda Coaching Depot: 3 Pit lines (2 25 ICF/22 LHB, 1 23 ICF/21 LHB)
3-C Vijayawada Division
Vijayawada Coaching Depot – 5 Pit lines (2 25 ICF/23 LHB, 1 24 ICF/21 LHB, 1 13 ICF/12 LHB, 1 10 ICF/09 LHB) +
2 New Integrated Pit lines (Each 29 ICF/26 LHB) (Under Construction) (Kindly let me know the status)
Kakinada Port Coaching Depot – 2 Pit lines (1-26 ICF/23 LHB, 1-23 ICF/21 LHB) + 1 New Pit line (24 ICF/22 LHB) \
(Under Construction)
(New Pitlines have been proposed at NS, Kindly let me know the status)
3-D Guntur Division:
Guntur Coaching Depot – 2 Pit lines (1 25 ICF/22 LHB, 1 24 ICF/22 LHB)
Nallapadu Coaching Depot – 1 Pit line (33 ICF/30 LHB)
3-E Guntakal Division:
Tirupati Coaching Depot – 5 Pit lines (1 25 ICF/23 LHB, 3 24 ICF/22 LHB, 1 22 ICF/20 LHB)
Renigunta – 1 Pit line (3 ICF)
Guntakal – 1 Pit line (10 ICF/09 LHB)
f) Nanded Division:
• Nanded Coaching Depot – 3 Pit lines (1-24 ICF/23 LHB, 1-21 ICF/19 LHB, 1-20 ICF/18 LHB)
Purna – 1 Pit line (18 ICF/17 LHB)
*Aurangabad – 1 New Pit line (17 ICF/15 LHB) (No Idea/Sanctioned)
*Jalna – 1 New Pit line (30 ICF/27 LHB) (No Idea/Under Construction)
*Adilabad – 1 New Pit line (26 ICF/24 LHB) (No Idea/Sanctioned)
5-A Howrah Division:
Tikiapara Coaching Depot (HWH): 15 Pitlines (2 26 ICF/24 LHB, 3 24 LHB/22 ICF, 2 23 ICF/21 LHB,
2 21 ICF/19 LHB, 2 19 ICF/17 LHB, 1 18 ICF/16 LHB,
17 ICF/16 LHB, 2 17 ICF/15 LHB) + 4 NEW PITLINES PROPOSED
Liluah Coaching Depot/Sorting Yard (HWH): 10 Pitlines (1 26 ICF/24 LHB, 7 24 ICF/22 LHB, 1 22 ICF/20 LHB,
1 12 ICF/10 LHB)
Jheel Siding Coaching Depot (Howrah): 1 Pitline (13 ICF/11 LHB) + 2 New Pit lines (ALL 26 ICF/24 LHB) (Under Construction)
Bardhhaman Jn: 2 Pitlines (ALL 8 ICF/6 LHB)
Azimganj: 2 Pitlines (ALL 09 ICF/07 LHB)
5-B Sealdah Division:
Sealdah: 8 Pitlines 3 24 ICF/22 LHB), 1 23 ICF/21 LHB, 3 22 ICF/ 21 LHB, 1 18 ICF/16 LHB)
Kolkata Terminal: 3 Pitlines (2 24 ICF ICF/22 LHB, 1 21 ICF / 19 LHB) + 1 New Pitline (13 ICF + 12 LHB) Under Construction
5-C Asansol Division:
Asansol: 4 Pitlines (3 24 ICF/22 LHB, 1 20 ICF/18 LHB)
Madhupur: NEW PITLINE (24 ICF / 22 LHB) UNDER Construction
Deoghar: NEW PITLINE (14 ICF/ 12 LHB) Under Construction
5-D Malda Town Division:
Malda Town: 3 Pitlines (ALL 24 ICF / 22 LHB)
Bhagalpur: 3 Pitlines (2 24 ICF/22 LHB, 1 20 ICF/18 LHB) + 1 New Pitline (24 ICF/22 LHB) Under Construction
Godda: PITLINE Under Construction (24 ICF/22 LHB)
Jamalpur: (17 ICF)
Sahibganj: (12 ICF)
6) SOUTH EASTERN RAILWAYS:
6-A Kharagpur Division
Santragachi Coaching Depot: 11 Pitlines (1 25 ICF/23 LHB, 3 24 ICF,22 LHB, 2 23 ICF, 20 LHBM 22 ICF/19 LHB, 2 20 ICF/18 LHB, 1 19 ICF/18 LHB, 1 17 ICF, 16 LHB)
Padmapukur Coaching depot: 3 Pitlines (ALL 26 ICF/24 LHB)
Kolkata Shalimar Coaching Depot: 2 New Pitlines (ALL 24 ICF/22 LHB) (Under construction)
Kharagpur Coach Depot: 2 pitlines (1 18 ICF / 16 LHB, 1 15 ICF/13 LHB)
6-B Ranchi Division:
Hatia Coaching Depot (Ranchi): 8 Pitlines (2 26 ICF/24 LHB, 4 24 ICF/22 LHB, 1 15 ICF/14 LHB, 1 14 ICF/13 LHB)
6-C Chakradharpur Division:
Tatanagar: 3 Pitlines (ALL 26ICF / 24 LHB)
Rourkela Coaching Depot: 2 Pitlines (1 24 ICF / 22LHB, 1 17 ICF,15 LHB)
Jharsuguda Coaching Depot: 1 Pitline (DILAPIDATED)
6-D Adra Division
Adra: 1 Pitline
Bokaro Steel City 1 Pitline DILAPIDATED
Jan 14 2023 (15:37)
(More Zones will be added as i find out more updated info, SCR
Jan 14 2023 (15:36)
Manjatidal (TPJ): NEW MEMU Shed under construction
(More Zones will be added as i find out more updated info, SCR and SR Are ready but many constructions are being shown and i cant find much info, so temporarily holding them off until i can get my doubts cleared by those members)
Jan 14 2023 (12:29)
4) SOUTHERN RAILWAY:
4-A Chennai Division:
Basin Bridge Coach Care Complex (Chennai Central) – 16 Pit lines (6 24 ICF/24 LHB, 4 21 ICF/19 LHB, 2 20 ICF/18 LHB, 2 19 ICF/17 LHB, 2 15 ICF/13 LHB)
Gopalswamy Nagar Coaching Depot (Chennai Egmore) – 3 Pit lines (1 26 ICF/24 LHB, 1 24 ICF/22 LHB, 1 18 ICF/16 LHB)
Tambaram – 2 Pit lines (26 ICF/24 LHB) + 2 New Pit lines (26 ICF/24 LHB) (Under Construction) + 1 NEW PITLINE Sanctioned
4-B Madurai Division:
Madurai – 4 Pit lines (3-26 ICF/24 LHB, 1-24 ICF/22 LHB)
Tirunelveli – 3 Pit lines (Each 26 ICF/24 LHB)
Rameswaram – 2 Pit lines (Each 26 ICF/24 LHB) (NEW Pitline SANCTIONED)
Tuticorin – 1 Pit line (21 ICF/19 LHB)
4-C Tiruchchirappalli Division:
Tiruchchirappalli – 3 Pit lines (2-24 ICF/22 LHB, 1-13 ICF/11 LHB)
Villupuram – 1 Pit line (26 ICF/24 LHB)
4-D Salem Division:
Coimbatore – 2 Pit lines (Each 26 ICF/24 LHB)
Erode – 2 Pit lines (1 24 ICF/22 LHB, 1 10 ICF/8 LHB)
4-E Thiruvananthapuram Division:
Thiruvananthapuram – 5 Pit lines (1-26 ICF/24 LHB, 2-24 ICF/22 LHB, 1-20 ICF/18 LHB)
Kochuveli – 3 Pit lines (Each 24 ICF/22 LHB)
Nagercoil – 3 Pit lines (Each 26 ICF/24 LHB)+ 2 New Pit lines (26 ICF/24 LHB) (Under Construction)
Ernakulam – 3 Pit lines (Each 26 ICF/24 LHB)
Alappuzha – 1 Pit line (18 ICF/16 LHB)
4-F Palakkad (Palghat) Division:
Mangalore Central – 3 Pit lines (2 24 ICF/22 LHB, 1 18 ICF/16 LHB) + 1 New Pit line (24 ICF/22 LHB) (Under Construction)
Shoranur – 1 Pit line (12 ICF/10 LHB)
13 compliments
Great Great Useful Great Great Great Great Great Great Great Great:Excellent Great Great
Great Great Useful Great Great Great Great Great Great Great Great:Excellent Great Great
Hello All,
I Am planning to update Details of All Pitlines in All Zones/Divisions:
Recently noticed that there were 2 Blogs on this same thing, But both of them were made by now deleted IRI Members meaning you'd not be able to contact them, and some of the Info in the posts also had gotten outdated, so here's the latest Updated Details,...
more...
I Am planning to update Details of All Pitlines in All Zones/Divisions:
Recently noticed that there were 2 Blogs on this same thing, But both of them were made by now deleted IRI Members meaning you'd not be able to contact them, and some of the Info in the posts also had gotten outdated, so here's the latest Updated Details,...
more...
from various responses of both blogs:
quick notes:
1) LAST UPDATED: 06/08/2023 12:05PM
This counter will be updated as i add more info, so that my updates are transparent to everyone.
2) if any station is missing or any info is wrong, let me know
3) Source: /blog/post/5416065 and other blogs
4) All Info will be updated as Zone Wise Parts.
1) CENTRAL RAILWAYS:
1-A) Mumbai CSMT Division:
Mumbai CSMT: 2 Pitlines (1 22 ICF / 20 LHB)
Wadi Bunder Yard: 8 Pitlines ( ALL 26 ICF / 24 LHB)
Mazgaon Yard: 6 Pitlines (1 19 ICF / 17 LHB, 2 18 ICF/16 LHB,
3 17ICF/15 LHB)
LTT: 8 Pitlines: (6 26 ICF/ 24 LHB, 2 26 ICF / 23 LHB)
Dadar Central: 2 (Each 17ICF / 15 LHB)
(According to the blog posted earlier in July, 4 Pitlines are proposed at Kalamboli)
1-B
Pune Division:
Pune Ghorpadi Coach Care Complex (GCMC): 5 Pitlines (ALL 26 ICF / 24 LHB)
Washing Lines:
OLD: 2 Pitlines (1 24 ICF/22 LHB, 15 ICF/ 14 LHB)
NEW: 4 Pitlines (3 16 ICF / 14 LHB 1 12 Coach ICF EMU Rake pitline)
Kolhapur - 2 Pit line (1 24 ICF / 21 LHB, 1 22 ICF / 19 LHB)
Miraj - 2 Pitlines (Each 12 ICF / 10 LHB)
1-C
Nagpur Division (CR):
Nagpur Coach Care Complex: 2 Pitlines (ALL 26ICF / 24 LHB)
(according to earlier blog, a proposal went to replace the old pitlines with new ones, Each 27 ICF/24 LHB)
Ajni Coach Care Complex: 1 Pitline (26 ICF / 24 LHB) (+1 NEW PITLINE Under Construction 26 ICF/24 LHB)
Balharshah: 1 New Pitline 28 ICF/25 LHB Under Construction
1-D
Solapur Division
Solapur: 3 Pitlines (2 26 ICF/24 LHB, 1 18 ICF/ 15 LHB)
Kalaburagi: 1 Pitline (26 ICF/24 LHB)
Daund: 1 Pitline (12 ICF/ 10 LHB)
1-E Bhusaval Division
Bhusaval: 3 Pitlines (1 21 ICF/18 LHB, 2 17 ICF / 14 LHB) + NEW PITLINE CONSTRUCTION, please update me on this, 25 ICF / 24 LHB.
Manmad: 1 Pitline (24 ICF/22 LHB )
Amravati: 1 Pitline (24 ICF/ 22 LHB)
Chalisgaon: 1 Pitline (7 ICF/6 LHB)
2) SOUTH WESTERN RAILWAYS:
2-A KSR Bengaluru Division
KSR Bengaluru Coach Depot: 4 Pitlines (4 24 ICF/ 22 LHB)
Yesvantpur Coaching Depot: 4 Pitlines (1 26 ICF /24 LHB, 1 25 ICF/23 LHB, 2 24 ICF/22 LHB)
Baiyappanahalli Coaching Depot: 3 Pitlines (ALL 24 ICF/22 LHB)
2-B Mysore Division
Mysuru Coaching Depot: 4 Pitlines (3 24 ICF / 22 LHB, 1 21 ICF/19 LHB)
Arsikere Coaching Depot: 1 Pitline (18 ICF ONLY, Extension works are going on as per blog, update and ill fix this)
Kotegangur: Pitline Construction going on.
2-C Hubli Division:
Hubli Coaching Depot: 4 Pitlines (2 24 ICF/22 LHB, 1 23 ICF/21 LHB, 1 22 ICF/20 LHB) (Again New Pitline construction supposed to happen here, comment if it has happened and ill change it)
Vasco Da Gama - 2 Pitlines (21 ICF/19 LHB, 24 ICF, 22 LHB)
Belagavi Pitline: 1 Pitline 27 ICF/26 LHB
Vijayapura: Under Construction
3) SOUTH CENTRAL RAILWAYS
3-A Secunderabad Division
Secunderabad Coaching Depot: 6 Pitlines (4 26 ICF/24 LHB, 1 24 ICF/ 22 LHB, 1 23 ICF, 21 LHB)
Hyderabad Coaching Depot: 7 Pitlines (2 24 ICF/22 LHB, 1 16 ICF/ 14 LHB, 1 15 ICF/13 LHB)
Charlapalli Coaching Depot: 4 Pit lines (ALL 26 ICF/24 LHB)
Kazipet Coaching Depot: 4 Pit lines (2 29 ICF/26 LHB, 2 10 ICF/09 LHB)
Khanapur: 1 Pitine (24 ICF/22 LHB)
Bhadrachalam Road: 1 Pit line (16 ICF/14 LHB)
3-B Hyderabad Division:
Kacheguda Coaching Depot: 3 Pit lines (2 25 ICF/22 LHB, 1 23 ICF/21 LHB)
3-C Vijayawada Division
Vijayawada Coaching Depot – 5 Pit lines (2 25 ICF/23 LHB, 1 24 ICF/21 LHB, 1 13 ICF/12 LHB, 1 10 ICF/09 LHB) +
2 New Integrated Pit lines (Each 29 ICF/26 LHB) (Under Construction)
Kakinada Port Coaching Depot – 3 Pitlines - (ALL 24 ICF/22 LHB), + 2 Stabling lines
Machilipatnam: 2 Pitlines – Both 24 ICF/22 LHB
Narsapur: 2 Pitlines, ONE Dilapidated so replacement proposed with one new pitlines.
3-D Guntur Division:
Guntur Coaching Depot – 2 Pit lines (1 25 ICF/22 LHB, 1 24 ICF/22 LHB)
Nallapadu Coaching Depot – 1 Pit line (33 ICF/30 LHB) (NOT OPERATIONAL)
3-E Guntakal Division:
Tirupati Coaching Depot – 5 Pit lines (1 25 ICF/23 LHB, 3 24 ICF/22 LHB, 1 22 ICF/20 LHB)
Renigunta – 1 Pit line (3 ICF)
Guntakal – 1 Pit line (10 ICF/09 LHB)
f) Nanded Division:
• Nanded Coaching Depot – 3 Pit lines (1-24 ICF/23 LHB, 1-21 ICF/19 LHB, 1-20 ICF/18 LHB)
Purna – 1 Pit line (18 ICF/17 LHB)
*Aurangabad – 1 New Pit line (17 ICF/15 LHB) (Under Construction)
*Jalna – 1 New Pit line (30 ICF/27 LHB) (Nearly Completed)
*Adilabad – 1 New Pit line (26 ICF/24 LHB) (Under Construction)
4) SOUTHERN RAILWAY:
4-A Chennai Division:
Basin Bridge Coach Care Complex (Chennai Central) – 16 Pit lines (6 24 ICF/24 LHB, 4 21 ICF/19 LHB, 2 20 ICF/18 LHB, 2 19 ICF/17 LHB, 2 15 ICF/13 LHB)
Gopalswamy Nagar Coaching Depot (Chennai Egmore) – 3 Pit lines (1 26 ICF/24 LHB, 1 24 ICF/22 LHB, 1 18 ICF/16 LHB)
Tambaram – 4 Pitlines (26 ICF/24 LHB) (Under Construction) + 1 NEW PITLINE Sanctioned
4-B Madurai Division:
Madurai – 4 Pit lines (3-26 ICF/24 LHB, 1-24 ICF/22 LHB)
Tirunelveli – 3 Pit lines (Each 26 ICF/24 LHB)
Rameswaram – 2 Pit lines (Each 26 ICF/24 LHB) (NEW Pitline SANCTIONED)
Tuticorin – 1 Pit line (21 ICF/19 LHB)
4-C Tiruchchirappalli Division:
Tiruchchirappalli – 3 Pit lines (2-24 ICF/22 LHB, 1-13 ICF/11 LHB)
Villupuram – 1 Pit line (26 ICF/24 LHB)
Manjatidal (TPJ): NEW MEMU Shed under construction
4-D Salem Division:
Coimbatore – 2 Pit lines (Each 26 ICF/24 LHB)
Erode – 2 Pit lines (1 24 ICF/22 LHB, 1 10 ICF/8 LHB)
4-E Thiruvananthapuram Division:
Thiruvananthapuram – 5 Pit lines (1-26 ICF/24 LHB, 2-24 ICF/22 LHB, 1-20 ICF/18 LHB)
Kochuveli – 3 Pit lines (Each 24 ICF/22 LHB)
Nagercoil – 3 Pit lines (Each 26 ICF/24 LHB)+ 2 New Pit lines (26 ICF/24 LHB) (Under Construction)
Ernakulam – 3 Pit lines (Each 26 ICF/24 LHB)
Alappuzha – 1 Pit line (18 ICF/16 LHB)
4-F Palakkad (Palghat) Division:
Mangalore Central – 3 Pit lines (2 24 ICF/22 LHB, 1 18 ICF/16 LHB) + 1 New Pit line (24 ICF/22 LHB) (Under Construction)
Shoranur – 1 Pit line (12 ICF/10 LHB)
Palakkad Town: 1 NEW Pitline under construction
5) EASTERN RAILWAYS:
5-A Howrah Division:
Tikiapara Coaching Depot (HWH): 15 Pitlines (2 26 ICF/24 LHB, 3 24 LHB/22 ICF, 2 23 ICF/21 LHB,
2 21 ICF/19 LHB, 2 19 ICF/17 LHB, 1 18 ICF/16 LHB,
17 ICF/16 LHB, 2 17 ICF/15 LHB)
Liluah Coaching Depot/Sorting Yard (HWH): 10 Pitlines (1 26 ICF/24 LHB, 7 24 ICF/22 LHB, 1 22 ICF/20 LHB,
1 12 ICF/10 LHB)
Jheel Siding Coaching Depot (Howrah): 5 Pitlines (1 13 ICF/11 LHB) + 2 Pitlines (ALL 26 ICF/24 LHB) + 2 New Pitlines Commissioned, The 3 old pitlines are considered for upgradation
Bardhhaman Jn: 2 Pitlines (ALL 8 ICF/6 LHB)
Azimganj: 2 Pitlines (ALL 09 ICF/07 LHB)
5-B Sealdah Division:
Sealdah: 8 Pitlines 3 24 ICF/22 LHB), 1 23 ICF/21 LHB, 3 22 ICF/ 21 LHB, 1 18 ICF/16 LHB)
Kolkata Terminal: 3 Pitlines (2 24 ICF ICF/22 LHB, 1 21 ICF / 19 LHB) + 1 New Pitline (13 ICF + 12 LHB) Under Construction
5-C Asansol Division:
Asansol: 4 Pitlines (3 24 ICF/22 LHB, 1 20 ICF/18 LHB)
Madhupur: NEW PITLINE (24 ICF / 22 LHB) UNDER Construction
Deoghar: NEW PITLINE (14 ICF/ 12 LHB) Under Construction
5-D Malda Town Division:
Malda Town: 3 Pitlines (ALL 24 ICF / 22 LHB)
Bhagalpur: 3 Pitlines (2 24 ICF/22 LHB, 1 20 ICF/18 LHB) + 1 New Pitline (24 ICF/22 LHB) Under Construction
Godda: PITLINE Under Construction (24 ICF/22 LHB)
Jamalpur: (17 ICF)
Sahibganj: (12 ICF)
6) SOUTH EASTERN RAILWAYS:
6-A Kharagpur Division
Santragachi Coaching Depot: 11 Pitlines (1 25 ICF/23 LHB, 3 24 ICF,22 LHB, 2 23 ICF, 20 LHB, 22 ICF/19 LHB, 2 20 ICF/18 LHB, 1 19 ICF/18 LHB, 1 17 ICF, 16 LHB)
Padmapukur Coaching depot: 3 Pitlines (ALL 26 ICF/24 LHB)
Kolkata Shalimar Coaching Depot: 2 New Pitlines (ALL 24 ICF/22 LHB) (Under construction)
Kharagpur Coach Depot: 2 pitlines (1 18 ICF / 16 LHB, 1 15 ICF/13 LHB)
6-B Ranchi Division:
Hatia Coaching Depot (Ranchi): 8 Pitlines (2 26 ICF/24 LHB, 4 24 ICF/22 LHB, 1 15 ICF/14 LHB, 1 14 ICF/13 LHB)
6-C Chakradharpur Division:
Tatanagar: 3 Pitlines (ALL 26ICF / 24 LHB)
Rourkela Coaching Depot: 2 Pitlines (1 24 ICF / 22LHB, 1 17 ICF,15 LHB)
Jharsuguda Coaching Depot: 1 Pitline (DILAPIDATED)
6-D Adra Division
Adra: 1 Pitline
Bokaro Steel City 1 Pitline DILAPIDATED
7) NORTHERN RAILWAYS:
7-A Delhi Division:
Old Delhi (DLI): 4 Pitlines (1 26 ICF / 25 LHB, 1 25 ICF/ 24 LHB, 2 23 ICF/21 LHB)
New Delhi (NDLS): 13 Pitlines (2 28 ICF / 26 LHB, 5 27 ICF/25 LHB, 2 27 ICF/25 LHB, 1 22 ICF/20 LHB, 1 21 ICF/19 LHB, 1 16 ICF / 15 LHB, 1 10 ICF / 9 LHB)
Hazrat Nizamuddin (NZM): 6 Pitlines (5 26 ICF / 24 LHB, 1 27 ICF/25 LHB)
Delhi Sarai Rohilla (DEE): 5 Pitlines (ALL 27 ICF/25 LHB)
Anand Vihar Term: 5 Pitlines (ALL 26 ICF / 24 LHB)
Shakurbasti: 2 Pitlines (ALL 26 ICF / 24 LHB)
Bijwasan (Delhi): 5 New Pitlines (ALL 27 ICF / 25 LHB) (UNDER Construction as of last update)
MTC/Meerut City: 1 Pitline (24 ICF / 22 LHB)
JIND: 1 Pitline (18 ICF / 17 LHB)
Panipat: 1 Pitline (14 ICF / 13 LHB)
7-B Lucknow NR Division:
Lucknow Charbagh: 6 Pitlines (1 26 ICF / 24 LHB, 1 26 ICF/ 1 18 ICF, 1 17 ICF, 1 15 ICF, 1 12 ICF
Varanasi Jn: 4 Pitlines: 1 26 ICF / 24 LHB, 1 26 ICF, 2 22 ICF) + 2 NEW Pitlines (26 ICF / 24 LHB) (Under Construction)
Ayodhya Cantt: 3 Pitlines (1 21 ICF / 08 ICF)
Sultanpur: 2 Pitlines (ALL 26 ICF / 24 LHB)
Rae Bareli: 1 Pitline (14 ICF) + 2 New Pitlines (Both 26 ICF / 24 LHB)
Pratapgarh – 1 Pit line (8 ICF) + 1 New Pit line (26 ICF/24 LHB) (Under Construction)
Prayagraj Sangam – 2 Pit lines (Each 26 ICF/24 LHB)
7-C Firozpur Division:
Firozpur Cantt – 2 Pit lines (Each 24 ICF/22 LHB)
Amritsar – 6 Pit lines (2 26 ICF/24 LHB, 1 25 ICF/24 LHB, 1 22 ICF/20 LHB, 1 21 ICF/19 LHB, 1 18 ICF/16 LHB)
Chheharta (Amritsar) – 2 Pit lines (ALL 27 ICF/26 LHB)
Jammu Tawi – 3 Pit lines (ALL 24 ICF/22 LHB)
SVDK (Katra) – 2 Pit lines (ALL 26 ICF/24 LHB)
Moradabad Division:
Bareilly Junction – 3 Pit lines (1-24 ICF/22 LHB, 1-18 ICF/16 LHB, 1-16 ICF/14 LHB) + 2 New Pit lines (Under Construction)
Dehradun – 2 Pit lines (Each 19 ICF/17 LHB)
Yog Nagari Rishikesh – 2 Pit lines (ALL 26 ICF/24 LHB)
Haridwar – 2 Pit lines (1 24 ICF/22 LHB, 1 22 ICF/20 LHB)
Moradabad – 2 Pit lines (1 13 ICF/12 LHB, 1 09 ICF/08 LHB)
Najibabad – 1 Pit line (13 ICF/12 LHB)
Balamau – 2 Pit lines (1 10 ICF/09 LHB, 1 07 ICF/09 LHB)
7-D Ambala Cantt. Division:
Chandigarh – 2 Pit lines (Each 25 ICF/24 LHB)
Ambala Cantt – 2 Pit lines (1-17 ICF/16 LHB, 1-13 ICF/12 LHB) + 1 New Pit line (24 ICF/22 LHB) (Proposed)
Saharanpur – 2 Pit lines (Each 13 ICF/12 LHB)
Bathinda – 2 Pit lines (1-14 ICF/13 LHB, 1-11 ICF/10 LHB)
Nangal Dam – 1 Pit line (15 ICF/14 LHB)
Kalka – 2 Pit lines (1-13 ICF/12 LHB, 1-12 ICF/11 LHB)
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
quick notes:
1) LAST UPDATED: 06/08/2023 12:05PM
This counter will be updated as i add more info, so that my updates are transparent to everyone.
2) if any station is missing or any info is wrong, let me know
3) Source: /blog/post/5416065 and other blogs
4) All Info will be updated as Zone Wise Parts.
1) CENTRAL RAILWAYS:
1-A) Mumbai CSMT Division:
Mumbai CSMT: 2 Pitlines (1 22 ICF / 20 LHB)
Wadi Bunder Yard: 8 Pitlines ( ALL 26 ICF / 24 LHB)
Mazgaon Yard: 6 Pitlines (1 19 ICF / 17 LHB, 2 18 ICF/16 LHB,
3 17ICF/15 LHB)
LTT: 8 Pitlines: (6 26 ICF/ 24 LHB, 2 26 ICF / 23 LHB)
Dadar Central: 2 (Each 17ICF / 15 LHB)
(According to the blog posted earlier in July, 4 Pitlines are proposed at Kalamboli)
1-B
Pune Division:
Pune Ghorpadi Coach Care Complex (GCMC): 5 Pitlines (ALL 26 ICF / 24 LHB)
Washing Lines:
OLD: 2 Pitlines (1 24 ICF/22 LHB, 15 ICF/ 14 LHB)
NEW: 4 Pitlines (3 16 ICF / 14 LHB 1 12 Coach ICF EMU Rake pitline)
Kolhapur - 2 Pit line (1 24 ICF / 21 LHB, 1 22 ICF / 19 LHB)
Miraj - 2 Pitlines (Each 12 ICF / 10 LHB)
1-C
Nagpur Division (CR):
Nagpur Coach Care Complex: 2 Pitlines (ALL 26ICF / 24 LHB)
(according to earlier blog, a proposal went to replace the old pitlines with new ones, Each 27 ICF/24 LHB)
Ajni Coach Care Complex: 1 Pitline (26 ICF / 24 LHB) (+1 NEW PITLINE Under Construction 26 ICF/24 LHB)
Balharshah: 1 New Pitline 28 ICF/25 LHB Under Construction
1-D
Solapur Division
Solapur: 3 Pitlines (2 26 ICF/24 LHB, 1 18 ICF/ 15 LHB)
Kalaburagi: 1 Pitline (26 ICF/24 LHB)
Daund: 1 Pitline (12 ICF/ 10 LHB)
1-E Bhusaval Division
Bhusaval: 3 Pitlines (1 21 ICF/18 LHB, 2 17 ICF / 14 LHB) + NEW PITLINE CONSTRUCTION, please update me on this, 25 ICF / 24 LHB.
Manmad: 1 Pitline (24 ICF/22 LHB )
Amravati: 1 Pitline (24 ICF/ 22 LHB)
Chalisgaon: 1 Pitline (7 ICF/6 LHB)
2) SOUTH WESTERN RAILWAYS:
2-A KSR Bengaluru Division
KSR Bengaluru Coach Depot: 4 Pitlines (4 24 ICF/ 22 LHB)
Yesvantpur Coaching Depot: 4 Pitlines (1 26 ICF /24 LHB, 1 25 ICF/23 LHB, 2 24 ICF/22 LHB)
Baiyappanahalli Coaching Depot: 3 Pitlines (ALL 24 ICF/22 LHB)
2-B Mysore Division
Mysuru Coaching Depot: 4 Pitlines (3 24 ICF / 22 LHB, 1 21 ICF/19 LHB)
Arsikere Coaching Depot: 1 Pitline (18 ICF ONLY, Extension works are going on as per blog, update and ill fix this)
Kotegangur: Pitline Construction going on.
2-C Hubli Division:
Hubli Coaching Depot: 4 Pitlines (2 24 ICF/22 LHB, 1 23 ICF/21 LHB, 1 22 ICF/20 LHB) (Again New Pitline construction supposed to happen here, comment if it has happened and ill change it)
Vasco Da Gama - 2 Pitlines (21 ICF/19 LHB, 24 ICF, 22 LHB)
Belagavi Pitline: 1 Pitline 27 ICF/26 LHB
Vijayapura: Under Construction
3) SOUTH CENTRAL RAILWAYS
3-A Secunderabad Division
Secunderabad Coaching Depot: 6 Pitlines (4 26 ICF/24 LHB, 1 24 ICF/ 22 LHB, 1 23 ICF, 21 LHB)
Hyderabad Coaching Depot: 7 Pitlines (2 24 ICF/22 LHB, 1 16 ICF/ 14 LHB, 1 15 ICF/13 LHB)
Charlapalli Coaching Depot: 4 Pit lines (ALL 26 ICF/24 LHB)
Kazipet Coaching Depot: 4 Pit lines (2 29 ICF/26 LHB, 2 10 ICF/09 LHB)
Khanapur: 1 Pitine (24 ICF/22 LHB)
Bhadrachalam Road: 1 Pit line (16 ICF/14 LHB)
3-B Hyderabad Division:
Kacheguda Coaching Depot: 3 Pit lines (2 25 ICF/22 LHB, 1 23 ICF/21 LHB)
3-C Vijayawada Division
Vijayawada Coaching Depot – 5 Pit lines (2 25 ICF/23 LHB, 1 24 ICF/21 LHB, 1 13 ICF/12 LHB, 1 10 ICF/09 LHB) +
2 New Integrated Pit lines (Each 29 ICF/26 LHB) (Under Construction)
Kakinada Port Coaching Depot – 3 Pitlines - (ALL 24 ICF/22 LHB), + 2 Stabling lines
Machilipatnam: 2 Pitlines – Both 24 ICF/22 LHB
Narsapur: 2 Pitlines, ONE Dilapidated so replacement proposed with one new pitlines.
3-D Guntur Division:
Guntur Coaching Depot – 2 Pit lines (1 25 ICF/22 LHB, 1 24 ICF/22 LHB)
Nallapadu Coaching Depot – 1 Pit line (33 ICF/30 LHB) (NOT OPERATIONAL)
3-E Guntakal Division:
Tirupati Coaching Depot – 5 Pit lines (1 25 ICF/23 LHB, 3 24 ICF/22 LHB, 1 22 ICF/20 LHB)
Renigunta – 1 Pit line (3 ICF)
Guntakal – 1 Pit line (10 ICF/09 LHB)
f) Nanded Division:
• Nanded Coaching Depot – 3 Pit lines (1-24 ICF/23 LHB, 1-21 ICF/19 LHB, 1-20 ICF/18 LHB)
Purna – 1 Pit line (18 ICF/17 LHB)
*Aurangabad – 1 New Pit line (17 ICF/15 LHB) (Under Construction)
*Jalna – 1 New Pit line (30 ICF/27 LHB) (Nearly Completed)
*Adilabad – 1 New Pit line (26 ICF/24 LHB) (Under Construction)
4) SOUTHERN RAILWAY:
4-A Chennai Division:
Basin Bridge Coach Care Complex (Chennai Central) – 16 Pit lines (6 24 ICF/24 LHB, 4 21 ICF/19 LHB, 2 20 ICF/18 LHB, 2 19 ICF/17 LHB, 2 15 ICF/13 LHB)
Gopalswamy Nagar Coaching Depot (Chennai Egmore) – 3 Pit lines (1 26 ICF/24 LHB, 1 24 ICF/22 LHB, 1 18 ICF/16 LHB)
Tambaram – 4 Pitlines (26 ICF/24 LHB) (Under Construction) + 1 NEW PITLINE Sanctioned
4-B Madurai Division:
Madurai – 4 Pit lines (3-26 ICF/24 LHB, 1-24 ICF/22 LHB)
Tirunelveli – 3 Pit lines (Each 26 ICF/24 LHB)
Rameswaram – 2 Pit lines (Each 26 ICF/24 LHB) (NEW Pitline SANCTIONED)
Tuticorin – 1 Pit line (21 ICF/19 LHB)
4-C Tiruchchirappalli Division:
Tiruchchirappalli – 3 Pit lines (2-24 ICF/22 LHB, 1-13 ICF/11 LHB)
Villupuram – 1 Pit line (26 ICF/24 LHB)
Manjatidal (TPJ): NEW MEMU Shed under construction
4-D Salem Division:
Coimbatore – 2 Pit lines (Each 26 ICF/24 LHB)
Erode – 2 Pit lines (1 24 ICF/22 LHB, 1 10 ICF/8 LHB)
4-E Thiruvananthapuram Division:
Thiruvananthapuram – 5 Pit lines (1-26 ICF/24 LHB, 2-24 ICF/22 LHB, 1-20 ICF/18 LHB)
Kochuveli – 3 Pit lines (Each 24 ICF/22 LHB)
Nagercoil – 3 Pit lines (Each 26 ICF/24 LHB)+ 2 New Pit lines (26 ICF/24 LHB) (Under Construction)
Ernakulam – 3 Pit lines (Each 26 ICF/24 LHB)
Alappuzha – 1 Pit line (18 ICF/16 LHB)
4-F Palakkad (Palghat) Division:
Mangalore Central – 3 Pit lines (2 24 ICF/22 LHB, 1 18 ICF/16 LHB) + 1 New Pit line (24 ICF/22 LHB) (Under Construction)
Shoranur – 1 Pit line (12 ICF/10 LHB)
Palakkad Town: 1 NEW Pitline under construction
5) EASTERN RAILWAYS:
5-A Howrah Division:
Tikiapara Coaching Depot (HWH): 15 Pitlines (2 26 ICF/24 LHB, 3 24 LHB/22 ICF, 2 23 ICF/21 LHB,
2 21 ICF/19 LHB, 2 19 ICF/17 LHB, 1 18 ICF/16 LHB,
17 ICF/16 LHB, 2 17 ICF/15 LHB)
Liluah Coaching Depot/Sorting Yard (HWH): 10 Pitlines (1 26 ICF/24 LHB, 7 24 ICF/22 LHB, 1 22 ICF/20 LHB,
1 12 ICF/10 LHB)
Jheel Siding Coaching Depot (Howrah): 5 Pitlines (1 13 ICF/11 LHB) + 2 Pitlines (ALL 26 ICF/24 LHB) + 2 New Pitlines Commissioned, The 3 old pitlines are considered for upgradation
Bardhhaman Jn: 2 Pitlines (ALL 8 ICF/6 LHB)
Azimganj: 2 Pitlines (ALL 09 ICF/07 LHB)
5-B Sealdah Division:
Sealdah: 8 Pitlines 3 24 ICF/22 LHB), 1 23 ICF/21 LHB, 3 22 ICF/ 21 LHB, 1 18 ICF/16 LHB)
Kolkata Terminal: 3 Pitlines (2 24 ICF ICF/22 LHB, 1 21 ICF / 19 LHB) + 1 New Pitline (13 ICF + 12 LHB) Under Construction
5-C Asansol Division:
Asansol: 4 Pitlines (3 24 ICF/22 LHB, 1 20 ICF/18 LHB)
Madhupur: NEW PITLINE (24 ICF / 22 LHB) UNDER Construction
Deoghar: NEW PITLINE (14 ICF/ 12 LHB) Under Construction
5-D Malda Town Division:
Malda Town: 3 Pitlines (ALL 24 ICF / 22 LHB)
Bhagalpur: 3 Pitlines (2 24 ICF/22 LHB, 1 20 ICF/18 LHB) + 1 New Pitline (24 ICF/22 LHB) Under Construction
Godda: PITLINE Under Construction (24 ICF/22 LHB)
Jamalpur: (17 ICF)
Sahibganj: (12 ICF)
6) SOUTH EASTERN RAILWAYS:
6-A Kharagpur Division
Santragachi Coaching Depot: 11 Pitlines (1 25 ICF/23 LHB, 3 24 ICF,22 LHB, 2 23 ICF, 20 LHB, 22 ICF/19 LHB, 2 20 ICF/18 LHB, 1 19 ICF/18 LHB, 1 17 ICF, 16 LHB)
Padmapukur Coaching depot: 3 Pitlines (ALL 26 ICF/24 LHB)
Kolkata Shalimar Coaching Depot: 2 New Pitlines (ALL 24 ICF/22 LHB) (Under construction)
Kharagpur Coach Depot: 2 pitlines (1 18 ICF / 16 LHB, 1 15 ICF/13 LHB)
6-B Ranchi Division:
Hatia Coaching Depot (Ranchi): 8 Pitlines (2 26 ICF/24 LHB, 4 24 ICF/22 LHB, 1 15 ICF/14 LHB, 1 14 ICF/13 LHB)
6-C Chakradharpur Division:
Tatanagar: 3 Pitlines (ALL 26ICF / 24 LHB)
Rourkela Coaching Depot: 2 Pitlines (1 24 ICF / 22LHB, 1 17 ICF,15 LHB)
Jharsuguda Coaching Depot: 1 Pitline (DILAPIDATED)
6-D Adra Division
Adra: 1 Pitline
Bokaro Steel City 1 Pitline DILAPIDATED
7) NORTHERN RAILWAYS:
7-A Delhi Division:
Old Delhi (DLI): 4 Pitlines (1 26 ICF / 25 LHB, 1 25 ICF/ 24 LHB, 2 23 ICF/21 LHB)
New Delhi (NDLS): 13 Pitlines (2 28 ICF / 26 LHB, 5 27 ICF/25 LHB, 2 27 ICF/25 LHB, 1 22 ICF/20 LHB, 1 21 ICF/19 LHB, 1 16 ICF / 15 LHB, 1 10 ICF / 9 LHB)
Hazrat Nizamuddin (NZM): 6 Pitlines (5 26 ICF / 24 LHB, 1 27 ICF/25 LHB)
Delhi Sarai Rohilla (DEE): 5 Pitlines (ALL 27 ICF/25 LHB)
Anand Vihar Term: 5 Pitlines (ALL 26 ICF / 24 LHB)
Shakurbasti: 2 Pitlines (ALL 26 ICF / 24 LHB)
Bijwasan (Delhi): 5 New Pitlines (ALL 27 ICF / 25 LHB) (UNDER Construction as of last update)
MTC/Meerut City: 1 Pitline (24 ICF / 22 LHB)
JIND: 1 Pitline (18 ICF / 17 LHB)
Panipat: 1 Pitline (14 ICF / 13 LHB)
7-B Lucknow NR Division:
Lucknow Charbagh: 6 Pitlines (1 26 ICF / 24 LHB, 1 26 ICF/ 1 18 ICF, 1 17 ICF, 1 15 ICF, 1 12 ICF
Varanasi Jn: 4 Pitlines: 1 26 ICF / 24 LHB, 1 26 ICF, 2 22 ICF) + 2 NEW Pitlines (26 ICF / 24 LHB) (Under Construction)
Ayodhya Cantt: 3 Pitlines (1 21 ICF / 08 ICF)
Sultanpur: 2 Pitlines (ALL 26 ICF / 24 LHB)
Rae Bareli: 1 Pitline (14 ICF) + 2 New Pitlines (Both 26 ICF / 24 LHB)
Pratapgarh – 1 Pit line (8 ICF) + 1 New Pit line (26 ICF/24 LHB) (Under Construction)
Prayagraj Sangam – 2 Pit lines (Each 26 ICF/24 LHB)
7-C Firozpur Division:
Firozpur Cantt – 2 Pit lines (Each 24 ICF/22 LHB)
Amritsar – 6 Pit lines (2 26 ICF/24 LHB, 1 25 ICF/24 LHB, 1 22 ICF/20 LHB, 1 21 ICF/19 LHB, 1 18 ICF/16 LHB)
Chheharta (Amritsar) – 2 Pit lines (ALL 27 ICF/26 LHB)
Jammu Tawi – 3 Pit lines (ALL 24 ICF/22 LHB)
SVDK (Katra) – 2 Pit lines (ALL 26 ICF/24 LHB)
Moradabad Division:
Bareilly Junction – 3 Pit lines (1-24 ICF/22 LHB, 1-18 ICF/16 LHB, 1-16 ICF/14 LHB) + 2 New Pit lines (Under Construction)
Dehradun – 2 Pit lines (Each 19 ICF/17 LHB)
Yog Nagari Rishikesh – 2 Pit lines (ALL 26 ICF/24 LHB)
Haridwar – 2 Pit lines (1 24 ICF/22 LHB, 1 22 ICF/20 LHB)
Moradabad – 2 Pit lines (1 13 ICF/12 LHB, 1 09 ICF/08 LHB)
Najibabad – 1 Pit line (13 ICF/12 LHB)
Balamau – 2 Pit lines (1 10 ICF/09 LHB, 1 07 ICF/09 LHB)
7-D Ambala Cantt. Division:
Chandigarh – 2 Pit lines (Each 25 ICF/24 LHB)
Ambala Cantt – 2 Pit lines (1-17 ICF/16 LHB, 1-13 ICF/12 LHB) + 1 New Pit line (24 ICF/22 LHB) (Proposed)
Saharanpur – 2 Pit lines (Each 13 ICF/12 LHB)
Bathinda – 2 Pit lines (1-14 ICF/13 LHB, 1-11 ICF/10 LHB)
Nangal Dam – 1 Pit line (15 ICF/14 LHB)
Kalka – 2 Pit lines (1-13 ICF/12 LHB, 1-12 ICF/11 LHB)
Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)
please wait...Translate to English
Hey everyone, I'm planning to update the details of all the pitlines in all zones/divisions. So, I recently noticed that there were 2 blogs about this, but both were made by now deleted IRI members, meaning you won't be able to contact them. Also, some of the info in the posts is outdated. So, here's the latest updated details from various responses of both blogs.
Quick notes:
1) Last updated: 06/08/2023 12:05PM
2) If any station is missing or any info is wrong, let me know.
3) Source: [link]
4) All info will be updated as zone wise parts.
1) CENTRAL RAILWAYS:
1-A) Mumbai CSMT Division:
- Mumbai CSMT: 2 Pitlines (1 22 ICF / 20 LHB)
- Wadi Bunder Yard: 8 Pitlines (All 26 ICF / 24 LHB)
- Mazgaon Yard: 6 Pitlines (1 19 ICF / 17 LHB, 2 18 ICF / 16 LHB, 3 17ICF / 15 LHB)
- LTT: 8 Pitlines (6 26 ICF / 24 LHB, 2 26 ICF / 23 LHB)
- Dadar Central: 2 (Each 17ICF / 15 LHB)
1-B) Pune Division:
- Pune Ghorpadi Coach Care Complex (GCMC): 5 Pitlines (All 26 ICF / 24 LHB)
- Washing Lines:
OLD: 2 Pitlines (1 24 ICF / 22 LHB, 15 ICF / 14 LHB)
NEW: 4 Pitlines (3 16 ICF / 14 LHB, 1 12 Coach ICF EMU Rake Pitline)
- Kolhapur: 2 Pitlines (1 24 ICF / 21 LHB, 1 22 ICF / 19 LHB)
- Miraj: 2 Pitlines (Each 12 ICF / 10 LHB)
1-C) Nagpur Division (CR):
- Nagpur Coach Care Complex: 2 Pitlines (All 26ICF / 24 LHB)
- Ajni Coach Care Complex: 1 Pitline (26 ICF / 24 LHB) (+1 NEW PITLINE under construction 26 ICF / 24 LHB)
- Balharshah: 1 New Pitline under construction 28 ICF / 25 LHB
1-D) Solapur Division:
- Solapur: 3 Pitlines (2 26 ICF / 24 LHB, 1 18 ICF/ 15 LHB)
- Kalaburagi: 1 Pitline (26 ICF / 24 LHB)
- Daund: 1 Pitline (12 ICF / 10 LHB)
1-E) Bhusaval Division:
- Bhusaval: 3 Pitlines (1 21 ICF / 18 LHB, 2 17 ICF / 14 LHB) + NEW PITLINE under construction 25 ICF / 24 LHB
- Manmad: 1 Pitline (24 ICF / 22 LHB)
- Amravati: 1 Pitline (24 ICF / 22 LHB)
- Chalisgaon: 1 Pitline (7 ICF / 6 LHB)
2) SOUTH WESTERN RAILWAYS:
2-A
please wait...Translate to Hindi
Hello sab log, mein hai planned kar raha hai ki saari Pitlines ki Details update karu All Zones/Divisions mein:
Recently notice kiya hai ki is same cheez par 2 Blogs hai, lekin dono blogs delete ho gaye IRI Members ke, matlab unse contact nahi kar sakte, aur posts mein se kuch Info outdated ho gayi hai, toh yahaan hai sabse latest Updated Details, various responses ke, dono blogs se:
quick notes:
1) LAST UPDATED: 06/08/2023 12:05PM
Yeh counter update hoga jab bhi main aur Info add karunga, taki mera update sabko transparent dikhe.
2) agar koi station missing hai ya koi Info galat hai, mujhe batao
3) Source: /blog/post/5416065 aur dusre blogs se
4) Saari Info update hongi Zone Wise Parts ke taur par.
1) CENTRAL RAILWAYS:
1-A) Mumbai CSMT Division (According to the blog posted earlier in July, 4 Pitlines are proposed at Kalamboli)
1-B Pune Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
1-C Nagpur Division (CR):
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
1-D Solapur Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
1-E Bhusaval Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
2) SOUTH WESTERN RAILWAYS:
2-A KSR Bengaluru Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
2-B Mysore Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
2-C Hubli Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
3) SOUTH CENTRAL RAILWAYS:
3-A Secunderabad Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
3-B Hyderabad Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
3-C Vijayawada Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
3-D Guntur Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
3-E Guntakal Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
4) SOUTHERN RAILWAY:
4-A Chennai Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
4-B Madurai Division:
URGENT. PLEASE TRANSL
Recently notice kiya hai ki is same cheez par 2 Blogs hai, lekin dono blogs delete ho gaye IRI Members ke, matlab unse contact nahi kar sakte, aur posts mein se kuch Info outdated ho gayi hai, toh yahaan hai sabse latest Updated Details, various responses ke, dono blogs se:
quick notes:
1) LAST UPDATED: 06/08/2023 12:05PM
Yeh counter update hoga jab bhi main aur Info add karunga, taki mera update sabko transparent dikhe.
2) agar koi station missing hai ya koi Info galat hai, mujhe batao
3) Source: /blog/post/5416065 aur dusre blogs se
4) Saari Info update hongi Zone Wise Parts ke taur par.
1) CENTRAL RAILWAYS:
1-A) Mumbai CSMT Division (According to the blog posted earlier in July, 4 Pitlines are proposed at Kalamboli)
1-B Pune Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
1-C Nagpur Division (CR):
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
1-D Solapur Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
1-E Bhusaval Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
2) SOUTH WESTERN RAILWAYS:
2-A KSR Bengaluru Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
2-B Mysore Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
2-C Hubli Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
3) SOUTH CENTRAL RAILWAYS:
3-A Secunderabad Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
3-B Hyderabad Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
3-C Vijayawada Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
3-D Guntur Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
3-E Guntakal Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
4) SOUTHERN RAILWAY:
4-A Chennai Division:
URGENT. PLEASE TRANSLATE THIS FIRST. ONLY A FEW HOURS LEFT!
4-B Madurai Division:
URGENT. PLEASE TRANSL
7 Public Posts - Sat Jan 14, 2023
7 Public Posts - Sun Jan 15, 2023
1 Public Posts - Wed May 10, 2023
1 Public Posts - Thu May 11, 2023
1 Public Posts - Sat May 13, 2023
2 Public Posts - Mon May 15, 2023
1 Public Posts - Thu Jul 20, 2023
4 Public Posts - Fri Jul 21, 2023
4 Public Posts - Wed Jul 26, 2023
7469 views
0
Exynos9611~
Exynos9611~ 16576 blog postsRe# 5600561-53 Past Edits
Aug 05 2023 (15:57)
add Jalna And Aurangabad Too Jalna 26 Coach Pit Line Under Construction And Aurangabad 16 Coach Pit Line Under Construction Which Will Be Extended Upto 26 Coach In Future
add Jalna And Aurangabad Too Jalna 26 Coach Pit Line Under Construction And Aurangabad 16 Coach Pit Line Under Construction Which Will Be Extended Upto 26 Coach In Future
add Jalna And Aurangabad Too Jalna 26 Coach Pit Line Under Construction And Aurangabad 16 Coach Pit Line Under Construction Which Will Be Extended Upto 26 Coach In Future
please wait...Translate to English
Add Jalna and Aurangabad too. Jalna's 26-coach pit line is currently under construction, and Aurangabad's 16-coach pit line is also under construction. In the future, Aurangabad's pit line will be extended to accommodate 26 coaches.
please wait...Translate to Hindi
Jalna aur Aurangabad ko bhi add kar do. Jalna mein 26 coach pit line under construction hai aur Aurangabad mein 16 coach pit line bhi under construction hai, jise future mein 26 coach tak extend kiya jayega.