Search Forum
Blog Entry# 5647595
Posted: Feb 28 2023 (18:25)
9 Responses
Last Response: Feb 28 2023 (19:47)
9 Responses
Last Response: Feb 28 2023 (19:47)
A new milestone added in the form of 4th Pit Line constructed at Dibrugarh Coaching Depot over Tinsukia division and commissioned on 28.02.2023. With a record time of construction in 15 months, this pit-line is one of its kind constructed in NFR, having all...weather covered shed, for uninterrupted rake examination round the clock. The three-level examination facility in the pit-line (pit level, catwalk level & roof level) will ensure a thorough examination of undergears, upper gears and roof mounted packaged units of the rake.The pit line is also equipped with provision of 750-volt power supply for examination of EOG rakes.
Source: DRM TSK Twitter Handle
Source: DRM TSK Twitter Handle
5 Posts
Sibsagar Passengers Needed Shatabdi Back As I Saw in Newspaper Clip It Will Benefit Lumding, Dimapur & Mariani also
I know they need it, but when it was running, no one used it. So railway cancelled it
The Local Newspapers Highlighted and They Need the Shatabdi To be Back
And railway has highlighted that the train was running empty so they will not run it again