Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

अपनी संपूर्ण क्रांति, राजधानी से कम है के 🔥- Arjun Rai

Search Forum
<<prev entry    next entry>>
Blog Entry# 5716012
Posted: May 07 2023 (11:57)

5 Responses
Last Response: Jun 30 2023 (09:12)
General Travel
28162 views
8

May 07 2023 (11:57)   LKO/Lucknow Charbagh NR (9 PFs)
AkashLKO~
AkashLKO~   802 blog posts
Entry# 5716012            Tags  
1 compliments
Great
Construction of 2 new Platforms at Lucknow NR side. Amongst the two new PFs, possibly one would be a cabway linked PF of LKO NR, adjacent to the previously existing LJN NER Cabway.

A better and clear overview of the plan would be visible after some more groundwork on the site !
Translate to English
Translate to Hindi

21259 views
0

May 07 2023 (12:15)
ShikariShambuJr~
ShikariShambuJr~   2575 blog posts
Re# 5716012-1               Past Edits
Aren't they kind if useless as they are terminating platforms?There is a need of full length platforms seeing the congestion at LKO.
The side in which these wre are terminating is similar to LJN so what is the use
Translate to English
Translate to Hindi

21253 views
1

May 07 2023 (12:27)
AkashLKO~
AkashLKO~   802 blog posts
Re# 5716012-2              
Can’t be said as useless. The time consumed by originating trains at a station such as LKO has a lot of impact on the traffic flow. Such originating trains if transferred to these new PFs would provide vacancy at LKO till the time entry exit lines are incresed to 4 from 2 (construction ongoing)
Translate to English
Translate to Hindi

14382 views
0

Jun 28 2023 (19:01)
PrakharYadav^~
PrakharYadav^~   13335 blog posts
Re# 5716012-3              
are they operational now ?
Translate to English
Translate to Hindi

13080 views
1

Jun 29 2023 (08:29)
AkashLKO~
AkashLKO~   802 blog posts
Re# 5716012-4              
Abhi nahi. PFs aur maybe washing lines with entry exit lines from Utraitia to Lucknow ka kaam sab ek sath hi chal raha hai LKO NR me ! Progress dikhti hai har baar jab aap jaye !
Translate to English
Translate to Hindi

4104 views
0

Jun 30 2023 (09:12)
kirk781^~   3752 blog posts
Re# 5716012-5              
LJN is seeing quite load these days especially in the afternoon due to originating/terminating trains. A terminal platform at LKO might allow couple of these trains to be shifted to LKO instead.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy