Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Maitree Express: মৈত্রী এক্সপ্রেস - দুই বাংলার সংস্কৃতি ও ভাতৃত্বের মেলবন্ধন - Joydeep Roy

Search Forum
<<prev entry    next entry>>
Blog Entry# 5727611
Posted: May 19 2023 (11:05)

25 Responses
Last Response: May 20 2023 (12:50)
General Travel
31602 views
7

May 19 2023 (11:05)   20171/Rani Kamalapati (Habibganj) - Hazrat Nizamuddin Vande Bharat Express | GWL/Gwalior Junction (4 PFs)
aryan89~
aryan89~   1832 blog posts
Entry# 5727611            Tags   Past Edits
1 compliments
Useful
Gwalior Station news....
Stoppage timing increased at various stations #Ranikamlapati NZM Vande Bharat Express
Translate to English
Translate to Hindi

20 Posts

8481 views
2

May 19 2023 (18:29)
Arpan~
Arpan~   5559 blog posts
Re# 5727611-21              
Totally Agree with you, after tracking and analyzing its run, we came to this conclusion that its original TT has a scope for 20 minutes speed up for 20171 and 15 minutes for 20172. This was running exceptionally well between halts and reaching well before time at JHS and AGC, it even sometimes reaches Gwalior early in morning even when there is no slack in JHS-GWL section. But instead of Railway reducing the travel time, they have increased it that too at the terminals, which is still not making sense to me, when the train is running early and even after increasing the halt time, NCR managed to speedup it a liitle in its zone, why are they handing over to NR and WCR late and making it slow by 5 minutes. I reached out to 1 of the official from BPL Div asking a reason for this but he was...
more...
also as clueless as me. This is a complete mockery of 160 kmph, as per new TT this VB is now 15 minutes slower than Gatimaan in same section with same MPS, which again is not a sense making decision.

Ideally the departure from RKMP should be 6:15/6:20 AM and arrival at NZM should be 13:30 and in return NZM departure should be 15:00 and RKMP arrival at 22:15, this way it will get speedup too and can reach at terminals at proper time. Working on this TT right now, will try to propose it to WCR.

Translate to English
Translate to Hindi

7691 views
1

May 19 2023 (18:35)
Dgvj01~
Dgvj01~   2614 blog posts
Re# 5727611-22              
1 compliments
Agree
Yes , this is true ! it should be speeded up.. it has potential of covering this distance in 7.15 hours. 5:40 am departure is too early/ Railways should instead optimize the timetable rather than destructing it..
Translate to English
Translate to Hindi

8399 views
0

May 19 2023 (18:36)
Sahug~
Sahug~   1861 blog posts
Re# 5727611-23              
Will this halt at Bina in return or its typo mistake in arrival/departure time?.
Translate to English
Translate to Hindi

7668 views
1

May 19 2023 (19:00)
Arpan~
Arpan~   5559 blog posts
Re# 5727611-24              
its passing time it will not stop at Bina.
Translate to English
Translate to Hindi

6884 views
1

May 20 2023 (12:50)
KamayaniExpress~
KamayaniExpress~   8399 blog posts
Re# 5727611-25               Past Edits
1 compliments
Agree
Speedup karne ke wajaye slow down kar diya faltu decision. Aise hi shatabdi ko barbad kiya ab isko kar denge...abhi VB saare station pe early lagti thi...fir bhi slow down kar diya easily bina slow down kiye halt time increase ho sakta tha
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy