Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

RailFanning is our All-Rounder Glucose that gives us Instant Power in All Seasons - Kirti Solanki

Search Forum
<<prev entry    next entry>>
Blog Entry# 5750244
Posted: Jun 13 2023 (14:17)

11 Responses
Last Response: Jun 14 2023 (16:38)
Info Update
72393 views
16

★★
Jun 13 2023 (14:17)   AP/Ashokapuram (3 PFs)
mys_air_rail_spotter
mys_air_rail_spotter   150 blog posts
Entry# 5750244            Tags  
3 compliments
Useful Great Useful
Hello everyone, I will be sharing some picturesque information about the ongoing developmental works at Ashokapuram (AP) Railway Station in Mysuru.

The main aim of the development of Ashokapuram (AP) is to facilitate the berthing capacity at Mysuru, reduce the burden of saturation at Mysuru (MYS) by extending few possible trains to the station, and eventually make it convenient for train travellers from central and south Mysuru to utilize the developed facility, instead of traveling 8-10 kms to the main station.
...
more...

The inauguration of the newly developed railway station of Ashokapuram will be on August 15th 2023 (Independence Day). Although, it can be subject to change.

The developmental works at Ashokapuram include :-

1) Yard modelling works for proper alignment of workshop yard as well as the backyard.

2) Construction of new Island Platform PF-4 & 5. The existing PF-1 to PF-3 are rebuilt with extending PF-1 towards Mysuru (MYS) side and Island platforms PF-2 & 3 extended towards Chamarajanagar (CMNR) side.

3)The existing PF-3 and new PF-4 tracks will be connecting both Mysuru (MYS) and Chamarajanagar (CMNR) sides. PF-5 will be connected only to MYS side but a separate dead end on CMNR side.

4) Remodelling of Workshop yard line, by building 2 new sets of shunting tracks next to PF-1 and main line, on the CMNR end.

5) Building another long shunting line next to PF-5 track line, which is dead end towards CMNR side and connected to rest of the platforms on MYS end.

6) Building of new second entry building in the backyard (not connected to the Platform)

7) Extension of the existing Foot over Bridge (FOB) from Island Platform 2&3 to Island platforms 4 & 5 to the second entry building.

Presently, the track remodelling works are over and new platform track lines are ready. The construction works for new 2nd entry building, new platforms 4 & 5, extension works of FOB, building of new Enroute Carriage Watering Systems for PFs 3,4 & 5, and other passenger friendly amenties are still going on. Electrification works are also going on and is disrupted due to remodelling works.

As per the plan, PF-1 & 2 will be utilized for trains running between MYS & CMNR, and PFs 3, 4 & 5 will be used for extended trains from MYS.

I will be sharing my personal renders of the railway station layouts, before and after remodelling. Will also share the pics with some markings.

---------------------------------------------------------------------
IMPORTANT !!

I personally request the admin to update the following information about Ashokapuram (AP) railway station.

Old station - 3 PFs -- PF-1 & 2 connected to both MYS & CMNR sides, PF-3 connected only to MYS side.

New station - 5 PFs -- PF-1, 2, 3 & 4 connected to both MYS & CMNR sides, PF-5 connected only to MYS side.

I request the admin to update the number of platforms of AP to be '5 - five' instead of '3 - three'

---------------------------------------------------------------------

Hope you all liked about the information.
Like !! Comment !! Subscribe !!!
THANK YOU ALL !!!

Translate to English
Translate to Hindi

1 Public Posts - Tue Jun 13, 2023

6608 views
1

Jun 13 2023 (15:56)
Vinay_Mysuru^~
Vinay_Mysuru^~   8087 blog posts
Re# 5750244-2              
Guess it will take min. 2 more months to complete
Translate to English
Translate to Hindi

3 Public Posts - Tue Jun 13, 2023

6 Public Posts - Wed Jun 14, 2023
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy