Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Pamban Sethu - இது தான் நம்முடைய ராமர் சேது - Darnish C

Search Forum
<<prev entry    next entry>>
Blog Entry# 5769122
Posted: Jul 05 2023 (08:09)

4 Responses
Last Response: Jul 05 2023 (21:19)
General Travel
20272 views
8

Jul 05 2023 (08:09)   BKN/Bikaner Junction (6 PFs)
Asitwas
Asitwas   1747 blog posts
Entry# 5769122            Tags  
6 compliments
Useful Useful Great Useful Useful Useful
Benisar TSS is completed but linking is still not successful with the grid for supply. Technical faults to stepdown 220kv into 25kv occuring in TSS.
Translate to English
Translate to Hindi

5861 views
1

Jul 05 2023 (13:27)
HaryanaExpress~
HaryanaExpress~   1515 blog posts
Re# 5769122-1              
1 compliments
Agree
Ye aisa hi Bikaner division m sabhi line electrified hai but kanhi TSS , kanhi connection Nahi hua hai
Translate to English
Translate to Hindi

4389 views
1

Jul 05 2023 (18:35)
Asitwas
Asitwas   1747 blog posts
Re# 5769122-2              
1 compliments
Agree
Adha kaam hai khud bikaner junction pe. Pitlines bhi unelectrified hai
Translate to English
Translate to Hindi

4342 views
0

Jul 05 2023 (19:41)
Asis~   998 blog posts
Re# 5769122-3              
GRID connectivity is in scope of Contractor or SEB [State electricity Board]...?
Translate to English
Translate to Hindi

3254 views
1

Jul 05 2023 (21:19)
Asitwas
Asitwas   1747 blog posts
Re# 5769122-4              
Grid connectivity is already done with TSS. But the voltage stepdown process is failed. The fault in equipments and the apparatus. Maybe the work done is too fast and of low quality.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy