Benisar TSS is completed but linking is still not successful with the grid for supply. Technical faults to stepdown 220kv into 25kv occuring in TSS.
3 Public Posts - Wed Jul 05, 2023
Grid connectivity is already done with TSS. But the voltage stepdown process is failed. The fault in equipments and the apparatus. Maybe the work done is too fast and of low quality.