IR Affairs
WR/Western
PrakharYadav^~ 1488 news posts
वेस्टर्न रेलवे पर छठी लाइन का संकट लगभग दूर होने वाला है। विलेपार्ले में अड़चन बनी इमारत के तीन फ्लैट धारकों को रेलवे दुगुना मुआवजा देने...
the sooner it happens, the better it is. WR should immediately start work on 5th and 6th lines between BVI and VR else they will face similar issue going forward
indeed ! quadruple, sextuple, missing connection link, wye, bypass, similar things sud b first priority for railways as it would be difficult in future (in terms of finances, viability, etc )
as u said, the sooner the better
as u said, the sooner the better