Search Forum
Blog Entry# 5799718
Posted: Aug 16 2023 (18:43)
5 Responses
Last Response: Aug 16 2023 (19:52)
5 Responses
Last Response: Aug 16 2023 (19:52)
Cabinet approves Seven Multi-tracking Projects totalling 2339 Kms. across Indian Railways, amounting to around Rs 32,500 crore
To increase the existing line capacity, smoothen train operations, reduce congestion and facilitate ease of travelling and transportation
Projects...
more...
To increase the existing line capacity, smoothen train operations, reduce congestion and facilitate ease of travelling and transportation
Projects...
more...
will generate direct employment for about 7.06 crore man-days during construction
Capacity augmentation works will result in additional freight traffic of magnitude 200 MTPA
Posted On: 16 AUG 2023 4:18PM by PIB Delhi
The Cabinet Committee on Economic Affairs chaired by Prime Minister, Shri Narendra Modi today approved Seven projects of Ministry of Railways with estimated cost of around Rs.32,500 Crore, with 100% funding from Central Government. The proposals of Multi-tracking will ease operations and reduce congestion, providing the much required infrastructural development on the busiest sections across Indian Railways.
The projects covering 35 Districts in 9 States i.e. Uttar Pradesh, Bihar, Telangana, Andhra Pradesh, Maharashtra, Gujarat, Odisha, Jharkhand and West Bengal will increase the existing network of Indian Railways by 2339 Kms. and will provide employment of 7.06 crore man-days to the people of the states.
The projects include:
S.No.
Name of the Project
Nature of the Project
1
Gorakhpur-Cantt-Valmiki Nagar
Doubling of existing line
2
Son Nagar-Andal Multi tracking Project
Multi Tracking
3
Nergundi-Barang and Khurda Road-Vizianagaram
3rd Line
4
Mudkhed-Medchal and Mahbubnagar-Dhone
Doubling of the existing line
5
Guntur-Bibinagar
Doubling of the existing line
6
Chopan-Chunar
Doubling of existing line
7
Samakhiali-Gandhidham
Quadrupling
These are essential routes for transportation of varied basket of commodities such as foodgrains, fertilizers, coal, cement, fly-ash, iron and finished steel, clinkers, crude oil, lime stone, edible oil etc. The capacity augmentation works will result in additional freight traffic of magnitude 200 MTPA (Million Tonnes Per Annum). The Railways being environment friendly and energy efficient mode of transportation, will help both in achieving climate goals and for reducing logistics cost of the country.
The projects are in line with Prime Minister’s Vision of a New India which will make people of the region “Atmanirbhar” by creating Multi-tasking work force in the region and will enhance their employment/self employment opportunities.
The projects are result of PM-Gati Shakti National Master Plan for Multi-model connectivity which have been possible through integrated planning and will provide seamless connectivity for movement of people, goods and services.
****
DS/SK
Capacity augmentation works will result in additional freight traffic of magnitude 200 MTPA
Posted On: 16 AUG 2023 4:18PM by PIB Delhi
The Cabinet Committee on Economic Affairs chaired by Prime Minister, Shri Narendra Modi today approved Seven projects of Ministry of Railways with estimated cost of around Rs.32,500 Crore, with 100% funding from Central Government. The proposals of Multi-tracking will ease operations and reduce congestion, providing the much required infrastructural development on the busiest sections across Indian Railways.
The projects covering 35 Districts in 9 States i.e. Uttar Pradesh, Bihar, Telangana, Andhra Pradesh, Maharashtra, Gujarat, Odisha, Jharkhand and West Bengal will increase the existing network of Indian Railways by 2339 Kms. and will provide employment of 7.06 crore man-days to the people of the states.
The projects include:
S.No.
Name of the Project
Nature of the Project
1
Gorakhpur-Cantt-Valmiki Nagar
Doubling of existing line
2
Son Nagar-Andal Multi tracking Project
Multi Tracking
3
Nergundi-Barang and Khurda Road-Vizianagaram
3rd Line
4
Mudkhed-Medchal and Mahbubnagar-Dhone
Doubling of the existing line
5
Guntur-Bibinagar
Doubling of the existing line
6
Chopan-Chunar
Doubling of existing line
7
Samakhiali-Gandhidham
Quadrupling
These are essential routes for transportation of varied basket of commodities such as foodgrains, fertilizers, coal, cement, fly-ash, iron and finished steel, clinkers, crude oil, lime stone, edible oil etc. The capacity augmentation works will result in additional freight traffic of magnitude 200 MTPA (Million Tonnes Per Annum). The Railways being environment friendly and energy efficient mode of transportation, will help both in achieving climate goals and for reducing logistics cost of the country.
The projects are in line with Prime Minister’s Vision of a New India which will make people of the region “Atmanirbhar” by creating Multi-tasking work force in the region and will enhance their employment/self employment opportunities.
The projects are result of PM-Gati Shakti National Master Plan for Multi-model connectivity which have been possible through integrated planning and will provide seamless connectivity for movement of people, goods and services.
****
DS/SK
please wait...Translate to English
Yo, the Cabinet just gave the green signal to seven dope projects on the Indian Railways, covering a total of 2339 Kms. These bad boys are gonna cost around Rs 32,500 crore. The goal is to increase capacity, smooth out train operations, reduce traffic, and make travel and transportation easier.
These projects are gonna create a shit ton of jobs, man. Around 7.06 crore man-days during construction. And check this out, once the capacity is increased, we're talking about an extra 200 MTPA of freight traffic, bro.
The projects gonna go down in 35 districts across 9 states: UP, Bihar, Telangana, Andhra Pradesh, Maharashtra, Gujarat, Odisha, Jharkhand, and West Bengal. It's gonna expand the Indian Railways network by 2339 Kms. And it's gonna provide employment for the people of those states.
Alright, let's break it down. The projects are as follows:
1. Gorakhpur-Cantt-Valmiki Nagar: We're doubling the existing line.
2. Son Nagar-Andal Multi-tracking Project: This one is all about multi-tracking, man.
3. Nergundi-Barang and Khurda Road-Vizianagaram: We're adding a third line.
4. Mudkhed-Medchal and Mahbubnagar-Dhone: Doubling up the existing line.
5. Guntur-Bibinagar: Doubling up the existing line yet again.
6. Chopan-Chunar: Doubling the existing line, my dude.
7. Samakhiali-Gandhidham: We're going all out with quadrupling.
These projects are key for transporting a bunch of different goods like foodgrains, fertilizers, coal, cement, and more. With the increased capacity, we're talking about an additional 200 MTPA of freight traffic, man. And let's not forget, railways are eco-friendly and energy-efficient. It's gonna help us reach our climate goals and reduce logistics costs.
These projects are in line with the Prime Minister's vision of a New India. They're gonna make the people of the region self-reliant, bro. It's gonna create a multi-tasking workforce and provide more employment opportunities.
And get this, man. These projects are part of the PM-Gati Shakti National Master Plan for Multi-model connectivity. It's all about integrated planning and seamless connectivity for people, goods, and services.
That's all, folks. Stay tuned for more updates.
please wait...Translate to Hindi
Kabinet ne saat Multi-tracking Projects ka manjoor kardiya hai, jo bharatiy rail par 2339 kilometer ka samaan hai, taakreeban Rs 32,500 crore ke barabar hai.
Maujooda line ka capacity badhane ke liye, train operation ko aaraam dene, bhid ko kam karne aur aasaani se travel aur transportation ko suvidhajanak banana ke liye.
Prakalp nirman ke dauraan 7.06 crore man-days tak seedhe rozgaar ka srot utpann hoga.
Capacity augmentation kaam se 200 MTPA ke aakar ki vridhi mai mal aur maal ki traffic badhegi.
Posted On: 16 AUG 2023 4:18PM by PIB Delhi.
Arthvyavastha Samiti ki adhyakshata mein pradhaan mantri Shri Narendra Modi ne aaj Rail Mantralaya ke saat prakalpon ka manjoor kar diya hai, jinki kharch ki lagat lagbhag Rs. 32,500 Crore tak hai, jismein kendriya sarkar se 100% ki vitti prapt hogi. Multi-tracking ke prastaav traino ke operation aur bhid ko kam karke bharatiy rail par sabse vyast bhago mein avashyak infrastarki vikaas pradan karenge.
Prakalp 9 rajyo mein 35 zilo ko kavering karenge jaise Uttar Pradesh, Bihar, Telangana, Andhra Pradesh, Maharashtra, Gujarat, Odisha, Jharkhand aur West Bengal. Ise bharatiy rail ki vartaman network ko 2339 kilometer se badhaya jayega aur isse in states ke logon ko 7.06 crore man-days tak rozgaar prapt hoga.
Prakalpo mein shamil hai:
Number: Project ka Naam: Project ka Prakriti:
1. Gorakhpur-Cantt-Valmiki Nagar: Existing line ki double kaam.
2. Son Nagar-Andal Multi tracking Project: Multi-tracking ka kaam.
3. Nergundi-Barang and Khurda Road-Vizianagaram: Third line ka kaam.
4. Mudkhed-Medchal and Mahbubnagar-Dhone: Maujooda line ki double kaam.
5. Guntur-Bibinagar: Maujooda line ki double kaam.
6. Chopan-Chunar: Existing line ki double kaam.
7. Samakhiali-Gandhidham: Charaguno ka kaam.
Ye zaroori maarg hain jo ki alag alag chezein jaise anaaj, urvarak, koyla, siment, fir-ash, loha aur koi samaptat upkaran, klinkar, kaccha tel aadi ko transport karne ke liye hai. Capacity augmentation kaam se 200 MTPA (Million Tonnes Per Annum) ki mehez vruddhi hoga. Rail gharelu-paryavaran aur urja-samvridh mode of transportation hone ke karan, isse hum klimet lakshya ko purn karne aur desh ke logistics cost ko kam karne mein madad milegi.
Ye prakalp hai Pradhan Mantri ke Naye Bharat ke vision ke sath, jismein ye kshetra ke logon ko "Atmanirbhar" banane ke liye kshetra mein multi-tasking skilled janta ko paida karenge aur unke rozgaar/swemployment ke avsar ko badhayenge.
Ye prakalp PM-Gati Shakti National Master Plan for Multi-model connectivity ke anuroop hain, jo integrated planning ke dwara sambhav hue hain aur logo, maal aur sevaon ki behtrin connectivity pradan karenge.
****
DS/SK
3 Public Posts - Wed Aug 16, 2023
Yeh wala part sabse bada bottleneck hoga. But avi modern technology hai jaldi se pahad ki katai ho jayegi.
please wait...Translate to English
please wait...Translate to Hindi
1 Public Posts - Wed Aug 16, 2023