Search Forum
Blog Entry# 5935709
Posted: Jan 08 (16:39)
5 Responses
Last Response: Feb 01 (16:53)
5 Responses
Last Response: Feb 01 (16:53)
I Asked in PG Portal That
There should be increase in number of Passenger Platform of the Sivasagar Town (SRTN) Railway Station under Tinsukia division is needed To Be Increased with FOBs. As Many Long Distance Train Arrive and Depart It will help Passengers to board and Deboard it also Lacks Coach Indicators which is needed and Will Help Passengers Who Take Long Distance Trains in Evening which will be Helpful to Kids, Women Passengers and Elderly Passengers. Please Help.
-------------------
Current...
more...
There should be increase in number of Passenger Platform of the Sivasagar Town (SRTN) Railway Station under Tinsukia division is needed To Be Increased with FOBs. As Many Long Distance Train Arrive and Depart It will help Passengers to board and Deboard it also Lacks Coach Indicators which is needed and Will Help Passengers Who Take Long Distance Trains in Evening which will be Helpful to Kids, Women Passengers and Elderly Passengers. Please Help.
-------------------
Current...
more...
Reply I Got is
Existing PF length was 200 m and its length has been increased to 200 more m in DBRG end and further increment of 150 m length is in progress towards Simaluguri end which will be completed by March 2024. Further there is no crossing of any trains at SRTN due to presence of SLGR junction and MRHT station where crossings takes place. Due to curvature of 4.5 degree at SRTN, PF construction in other side is not feasible. Now the PF length at SRTN will be 550 m which is feasible for any kind for train for boarding or detraining
Existing PF length was 200 m and its length has been increased to 200 more m in DBRG end and further increment of 150 m length is in progress towards Simaluguri end which will be completed by March 2024. Further there is no crossing of any trains at SRTN due to presence of SLGR junction and MRHT station where crossings takes place. Due to curvature of 4.5 degree at SRTN, PF construction in other side is not feasible. Now the PF length at SRTN will be 550 m which is feasible for any kind for train for boarding or detraining
How long is the 22 coach train?
Total length of 22 LHB coaches train formation is 528 metres, out of these 22 coaches 2 will be generator cars which will not carry any passenger. Effectively 20 coaches are used to carry passengers in LHB train formation.
Total length of 22 LHB coaches train formation is 528 metres, out of these 22 coaches 2 will be generator cars which will not carry any passenger. Effectively 20 coaches are used to carry passengers in LHB train formation.
After March 2024. The Platform Length will 550 Meters at Sibsagar Town. Waiting to Board 22-23 LHB Coach Train
As Per Pink Book 2024-2025 for NFR
SRTN JTTN New Line Is Still Showing
SRTN JTTN New Line Is Still Showing