Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

हमसे सीखे कोई जीने का सलीका। सफर कैसा भी हो, मौज़ उडाये जाते हैं।। - Amir

Search Forum
<<prev entry    next entry>>
Blog Entry# 5951863
Posted: Jan 25 (12:25)

2 Responses
Last Response: Jan 25 (12:27)
General Travel
5306 views
4

Jan 25 (12:25)  
traintraveler21955
traintraveler21955   135 blog posts
Entry# 5951863               Past Edits
1 compliments
Useful
#PuneMirajDoublingProject
● SECTION : PUNE TO SATARA ●

● Pune to Shindawane (31KM) FEDL

...
more...
Shindawane to Ambale (10KM)
Shindawane Ghat Doubling
Bridge no 35/1 :- Pillar work completed,Span work remaining
Tunnel No 1(Dn Line) :- Boring completed,Ground leveling work inprogress
Bridge No 36/1 and 36/2 :- Fully Completed,Track Laying and Pole erection pending
Bridge no 37/1 :- Foundation work started
Bridge No 37/2 and 37/3 :- No Work
Bridge No 38/1 :- Pillar work completed, Span work remaining
Ground Leveling work is almost completed
Poles are erected at some patches
Partially bracketing is done from Shindawane outer to some distance so as partially wiring at some places

● Ambale to Wathar (78 KM) FEDL

● Wathar to Palsi (9 KM)
Ground Leveling work and pole foundation work is in progress
Ground leveling work yet to start at some points

● Palsi to Jarandeshwar (9 KM) FEDL

● Jarandeshwar to Satara (8 KM)
Subgrade Work,Rock Cutting work and Minor Bridges work in progress
Blanketing ballast has arrived at some points

Total Doubled Line :- 118 KM
Under Doubling :- 27 KM

Source :- YouTube channel : KD Travel Studio
Attaching Vdos of the same under this post

Translate to English
Translate to Hindi

1 Public Posts - Thu Jan 25, 2024

4686 views
1

Jan 25 (12:27)
traintraveler21955
traintraveler21955   135 blog posts
Re# 5951863-2              
Part 2 : Wathar to Satara
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy