Search Forum
Blog Entry# 6013992
Posted: Mar 30 (18:17)
8 Responses
Last Response: Apr 25 (21:16)
8 Responses
Last Response: Apr 25 (21:16)
Very early starting time from Lucknow. Plus route is only 100 kph capable. To make it worse, more speed restrictions post Haridwar. IR could have easily introduced an overnight service b/w Lucknow and Dehradun. Would have been easier for passengers and probably more would have used it compared to an 8 Car VB.
1 Public Posts - Fri Apr 05, 2024
3 Public Posts - Sat Apr 06, 2024
This train has a lot of slack between HW and MB. According to the currently designed TT… by reducing slack and increasing MPS…
CDG-LKO is possible with limited stops @110 kmph !
The whole section between Delhi-MB-GKP-North Bihar is proposed to get 130 kmph shortly ! This is the part of IRs top strategic section .. would get Multi tracked and 160 kmph upgrade for sure after some time as per the plans…
CDG-LKO is possible with limited stops @110 kmph !
The whole section between Delhi-MB-GKP-North Bihar is proposed to get 130 kmph shortly ! This is the part of IRs top strategic section .. would get Multi tracked and 160 kmph upgrade for sure after some time as per the plans…
3 Public Posts - Thu Apr 25, 2024