Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

महाराष्ट्र एक्सप्रेस - कोल्हापूरपासून गोंदियापर्यंत, महाराष्ट्राची विविधता अनुभवणारी एक अविस्मरणीय आगगाडी! - Sakthivel Srinivasan

Search Forum
<<prev entry    next entry>>
Blog Entry# 6054767
Posted: May 06 (07:48)

No Responses Yet
Rail News
3744 views
0

Other News
NCR/North Central
May 06 (07:48)   Traffic Chaos in Mirzapur due to Damaged Alternative Route during Overpass Construction

AdittyaaSharma^~   73681 news posts
Entry# 6054767         Tags   Past Edits
Mirzapur News: आमघाट क्राॅसिंग से आवागमन बंद, वैकल्पिक मार्ग खस्ताहाल

Due to the construction of an overpass at the Amghat railway crossing in Mirzapur, traffic has been closed for the past 15 days. Now, barricades have been put up, completely blocking the passage for even bikes and bicycles. The alternative route provided for travel is in a damaged state, forcing people...
more...
to use it. The railway crossing was closed to traffic from April 20th, with an alternative route suggested: vehicles going from Mirzapur to Chunar are directed to use Baraunda intersection, Muhkuchwa, and the Mirzapur bypass, with the same route used for the return journey. Light and two-wheeled vehicles are suggested to use the Baraunda-Muhkuchwa left-side link road to Amghat. However, this alternate route is damaged, with the Garbada Devi Temple-Rajpur-Muhkuchwa route in a poor condition, containing 18 speed breakers in just 1km from the temple to the Rajpur canal, causing traffic jams. Residents complain that the alternative route should have been repaired before closing the Amghat bridge. The damaged road leads to delays, especially for schoolchildren in the mornings.

Mirzapur mein Amghat railway crossing pe upargami setu ban raha hai, is wajah se 15 din se traffic band hai. Ab barricade laga diya gaya hai, jisse bikes aur cycle wala bhi nahin jaa sakta. Logon ke liye jo alternative route diya gaya hai, woh kharab hai. 20 April se...
more...
railway crossing band hai aur ab dono taraf tin ka barrier laga diya gaya hai. Mirzapur se Chunar jaane wala vehicle Baraunda intersection, Muhkuchwa, aur Mirzapur bypass se jaayenge. Light aur two wheeler vehicle Baraunda se Muhkuchwa ke left side wali link road se Amghat jaa sakte hai. Lekin yeh alternative route kharab hai, Garbada Devi Temple se Rajpur-Muhkuchwa road kharab hai, aur usme 18 speed breaker hain, jisse jam hota hai. Log keh rahe hai ki Amghat bridge band karne se pehle kharab route ko theek karna chahiye tha. Road kharab hone ki wajah se subah school jaane walon ko der ho jaati hai.
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy