continuing from blog post 686456..
A WDG3A andal shed and a WDM3A Spj shed, having freight rakes waiting for signal to proceed further..
Looked liked the diesels were unsure of their future with the sight of OHEs..
A WDG3A andal shed and a WDM3A Spj shed, having freight rakes waiting for signal to proceed further..
Looked liked the diesels were unsure of their future with the sight of OHEs..
19 Public Posts - Thu Mar 07, 2013
but for that from LKO onwards till BJU whole track needs to be electrified...there are so many branch lines here...so a tough job for CORE..but yes definitely within next 5 yrs we can expect whole NER & ECR & partial NFR to be Electrified....
4 Public Posts - Thu Mar 07, 2013
3 Public Posts - Fri Mar 08, 2013