I woke up early in the morning @ 04:50 just to come to know that our train was furiously crossing through Manjuri Road.within few minutes it reached Baudpur & halted there for more than 5 mts...finally picked up speed & reached Bhadrakh flat 15 mts before time....enjoyed some early morning cup of tea @ BHC PF#2..All the other PF's & sidings of BHC were occupied by various categories of freights...finally a BTPN moved out of PF#1 to make way for 12802 Purushottam Exp bound for Puri. Sky was slowly clearing by this time & birds were enjoying their early morning time amidst chirping....The atmosphere was trully heavenly...but the arrival of Purushottam shattered the morning silence &...
more...
I woke up early in the morning @ 04:50 just to come to know that our train was furiously crossing through Manjuri Road.within few minutes it reached Baudpur & halted there for more than 5 mts...finally picked up speed & reached Bhadrakh flat 15 mts before time....enjoyed some early morning cup of tea @ BHC PF#2..All the other PF's & sidings of BHC were occupied by various categories of freights...finally a BTPN moved out of PF#1 to make way for 12802 Purushottam Exp bound for Puri. Sky was slowly clearing by this time & birds were enjoying their early morning time amidst chirping....The atmosphere was trully heavenly...but the arrival of Purushottam shattered the morning silence &...
more...
15 Public Posts - Mon Mar 25, 2013
At Bhedia(BDH) we were made to pass via Loop as there was a train waiting in the Main Line,finally reached Bolpur Shantiniketan @ 13.53 left after 4 mts Halt...after BHP,it didnt had much time to pick up the speed as soon again @ PNE,there was another BOXN waiting in the Main Line so we were again passed through Loop....then slowly we started gaining some speed...
One can see that Electrification work is going on in full swing as the OHE poles are ready in the SBG Loop...
One can see that Electrification work is going on in full swing as the OHE poles are ready in the SBG Loop...