Search Forum
Blog Entry# 860943
Posted: Sep 26 2013 (14:27)
9 Responses
Last Response: Sep 26 2013 (17:27)
9 Responses
Last Response: Sep 26 2013 (17:27)
I have been writing to SCR since 15 months to regularize these kind of trains.
Extend the Link(VSKP KZJ ) till SC and return in & around this slot and get attached to NZM KZJ VSKP @ KZJ so that it can continue as a full fledged train. The dep time can be adjusted to depart after mid night
Extend the Link(VSKP KZJ ) till SC and return in & around this slot and get attached to NZM KZJ VSKP @ KZJ so that it can continue as a full fledged train. The dep time can be adjusted to depart after mid night
5 Public Posts - Thu Sep 26, 2013
To run a new train, TT and coaches needed. But if you see, the SC stn is empty @ 4 am. and the dep time if properly planned can be around 00 30 hours.
No need of extra coaches or some SL/Ur coaches can be added
No need of extra coaches or some SL/Ur coaches can be added
3 Public Posts - Thu Sep 26, 2013